本文介绍我院安装美国瓦里安Clinac iX 医用直线加速器的前期准备工作和设备安装过程中遇到的问题及解决方法。实践证明在做好充分准备的基础上,结合机房实际情况密切与设备公司沟通能有效解决安装上的问题,减少失误、保证安装进程和设备质量。%In this paper, the preparation, problems and solutions encountered in the equipment installation of Varian Clinac iX medical linear accelerator in our hospital were introduced. It is proved that combining with actual situation in computer room and communicating with the equipment company can solve the installation problems, reduce errors and ensure the quality of the installation process and equipment.
展开▼