This paper introduced in details the implementation process of the application-level disaster tolerant system in the hospital information system. To ensure the proper function of the hospital information system (HIS), as well as to ensure the recovery of the HIS within short period of time during disaster, our hospital constructed the application-level disaster tolerant system, which includes three parts: business system end deployment, disaster tolerant system end deployment, and WEB management end deployment.%本文详细介绍了医院信息系统的应用级容灾体系的建设和实施过程。为确保我院医院信息系统(HIS)业务正常运行,并保证其在发生灾难时也能在短时间恢复业务正常,我院在计算机房进行应用级容灾系统建设,系统部署包括3部分:业务系统端部署、容灾系统端部署和WEB管理端部署。
展开▼