根据天津港地区预制构件混凝土施工特点,结合项目部2011—2012年预制构件混凝土施工经验,介绍水工混凝土构件冬季保温的几项措施,为类似工程混凝土保温提供借鉴。%According to the characteristics of construction of precast elements in Tianjin Port and the experience in precasting concrete elements during the winter from 2011 to 2012, this paper presents some heat preservation measures in precasting hydraulic concrete elements, providing reference for similar construction.
展开▼