首页> 外文期刊>计算机辅助绘图设计与制造(英文版) >A Hidden-Removal Model of Dam Perspective Drawing
【24h】

A Hidden-Removal Model of Dam Perspective Drawing

机译:大坝透视图的隐藏模型

获取原文
获取原文并翻译 | 示例
       

摘要

Aming at water conservancy project visualization, a hidden-removal method of dam perspective drawings is realized by building a hidden-removal mathematical model for overlapping points location to set up the hidden relationship among point and plane, plane and plane in space. On this basis, as an example of panel rockfill dam, a dam hidden-removal perspective drawing is generated in different directions and different visual angles through adapting VC++ and OpenGL visualizing technology. The results show that the data construction of the model is simple which can overcome the disadvantages of considerable and complicated calculation. This method also provides the new means to draw hidden-removal perspective drawings for those landforms and ground objects.
机译:在水利工程可视化研究中,通过建立重叠点位置的隐蔽数学模型,建立点与平面,平面与平面之间的隐蔽关系,实现了大坝透视图的隐蔽消除方法。在此基础上,以面板堆石坝为例,通过采用VC ++和OpenGL可视化技术,在不同方向,不同视角生成了坝体的暗挖透视图。结果表明,该模型的数据构造简单,可以克服计算量大,计算复杂的缺点。该方法还提供了绘制这些地形和地面对象的隐藏去除透视图的新方法。

著录项

  • 来源
  • 作者单位

    Faculty of Infrastructure Engineering, Dalian University of Technology, Dalian 116024, China;

    Faculty of Infrastructure Engineering, Dalian University of Technology, Dalian 116024, China;

    School of Foreign Languages, Dalian Ocean University, Dalian 116024, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TB391;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号