首页> 中文期刊> 《建筑热能通风空调》 >G PM 要求下制药厂暖通施工工艺分析

G PM 要求下制药厂暖通施工工艺分析

         

摘要

Pharm aceuticalplant HVAC construction is discussed in this article,to accord w ith the requirem entofG M P, the actualconstruction process adopted by som e ofthe construction technology and m atters thatshould be paid attention to. E specially for the clean air conditioning system specification, there is no clear guidance dem onstration steps and requirem ents ofand im plem entation ofdifferentialpressure device installation,and optim ization im plem entproblem s of HVAC system structure, this article w ill focus on the installation of differential pressure device and focus on HVAC system structure optim ization,atthe sam e tim e,itw illdiscuss the needing attention ofconstruction m aterials selectand HEPA diffuserinstallation process.%本文主要阐述了在制药厂暖通施工中,为符合GM P规范的要求,实际施工过程中所采用的一些施工工艺以及应注意的事项。特别是对于在与洁净空调系统相关的各项规范中,没有明确的指导压差装置安装的示范性步骤及要求,以及暖通系统结构的优化实施方面的问题,本文将针对压差装置的安装以及暖通系统结构的优化进行重点介绍,同时也对施工材料选用注意事项以及高效风口的安装工艺进行讨论。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号