国瑞·西安金融中心预埋锚栓群施工中,通过研究锚栓群本体及锚栓群与钢筋混凝土结构之间的位置关系,制订了一种采用分体组合式锚栓固定架技术和全站仪三维坐标观测技术相结合的方法,完成了锚栓群的预埋施工.%During the construction process of Pre-embedding anchor bolts group in Guorui, Xi'an Financial Center, through the study of anchor bolts group and the position relationship between anchor bolt group and reinforced concrete structure, separated combined anchor bolt bracket technology combining three-dimensional coordinate observation technology of total station is made, then successfully finished the construction of pre-embedding anchor bolts group.
展开▼