This paper discusses the single-machine rescheduling problem with efficiency and stability as criteria, where more than one disruption arises in large-scale dynamic circumstances. Partial rescheduling (PR) strategy is adopted after each disruption and a rolling mechanism is driven by events in response to disruptions. Two kinds of objective functions are designed respectively for PR sub-problem involving in the interim and the terminal of unfinished jobs. The analytical result demonstrates that each local objective is consistent with the global one. Extensive computational experiment was performed and the computational results show that the rolling PR strategy with dual objectives can greatly improve schedule stability with little sacrifice in efficiency and provide a reasonable trade-off between solution quality and computational efforts.