Simulation of bottleneck operations using concurrent engineering.

机译:使用并发工程模拟瓶颈操作。

获取原文
获取原文并翻译 | 示例

摘要

When parts cease to move in a work center, the size of the queue begins to grow. This kind of queuing is dreaded by every one in the plant. The concept of concurrent engineering is introduced to reduce the number of queues and their sizes by improving the production throughput. Concurrent engineering is one of the best tools to reduce the lead time and to improve process efficiency. To reduce the process set-up time, the operation type and process capacity must be considered.; Most companies are implementing concurrent engineering concept to stay abreast or ahead of the whirl wind changes in today's competitive market. When the demand exceeds the capacity of the certain process, bottleneck is formed. Even temporary bottlenecks can create major problems if they persist for long periods. To maintain output volume and to meet the due dates, bottlenecks should be avoided in the process. In this study, the concurrent engineering team concept is used to solve bottlenecks assuming the product type, the production process, the production time table, and the production volume required are known in advance. With the help of this study and a work procedure called 'One-Touch' the set-up time is reduced for the given process.; This study also considered a production process which was simulated using SIMFACTORY/SIMPROCESS to resolve the bottleneck. The approach utilizes the concurrent engineering concept applied to simulation. The results from the simulation run show the changes occurred when the set-up time was reduced for the machine or operation. Using the concurrent engineering approach a significant reduction in setup time and improved throughput is experienced through out the process.
机译:当零件在工作中心停止移动时,队列的大小开始增加。工厂中的每个人都对这种排队感到恐惧。引入并发工程的概念是通过提高生产吞吐量来减少队列的数量及其大小。并行工程是减少交付周期并提高过程效率的最佳工具之一。为了减少过程建立时间,必须考虑操作类型和过程容量。大多数公司正在实施并发工程概念,以与时并进,以应对当今竞争激烈的市场中的旋风式变化。当需求超出某个过程的能力时,就会形成瓶颈。如果长期存在,即使是暂时的瓶颈也会造成重大问题。为了保持产量并按期交货,应避免在此过程中出现瓶颈。在本研究中,假定产品类型,生产过程,生产时间表和所需的生产量事先已知,则使用并行工程团队概念来解决瓶颈。借助这项研究和称为“一键式”的工作程序,可以减少给定过程的设置时间。这项研究还考虑了使用SIMFACTORY / SIMPROCESS模拟生产过程以解决瓶颈的过程。该方法利用了应用于仿真的并行工程概念。仿真运行的结果表明,减少了机器或操作的设置时间后发生的变化。在整个过程中,使用并行工程方法可显着减少设置时间并提高吞吐量。

著录项

  • 作者单位

    Texas A&M University - Kingsville.;

  • 授予单位 Texas A&M University - Kingsville.;
  • 学科 Engineering Industrial.
  • 学位 M.S.
  • 年度 1995
  • 页码 134 p.
  • 总页数 134
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 一般工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号