The purpose of this research was to study the selection of architectural firms for 1997 and 1998 Indiana school construction projects of two million dollars or more. The study reported rankings for architectural selection criteria. Additionally, the study analyzed architectural selection procedures, architectural fees, the degree of respondent satisfaction with architectural services and the finished product, and the amount of inclusiveness in the selection.;State records were used to identify the projects approved during the two-year period. Additional data were collected for 81% of the projects via surveys completed by superintendents or their designees.;Major findings reported in the study include the following: (1) Fees paid to architects ranged from 3.2% to 12.9% of construction costs, with the mean fee being 5.7%. (2) In approximately 60% of the projects studied, respondents reported using an inclusive selection procedure for employing an architect. (3) Slightly less than one-third of the projects (29%) used a direct selection procedure that precluded the use of a selection committee or the consideration of more than one firm. (4) The two most frequently named selection criteria were experience in designing schools and reputation for completing projects within budget. (5) The only variable found to have a significant association with the amount of fee paid was satisfaction with architectural services. Respondents in the low-fee category identified the highly satisfied response more than was expected.;Outcomes suggest that a considerable number of school officials in the state did not adhere to the accepted best practices concerning competitive selection and the use of inclusive selection committees. The considerable variance in fees paid to architects was not explained by district size, district wealth, the nature of the construction project, or by the selection procedure used.;Additional research was recommended in the following areas: (a) replication of the study in other states, (b) qualitative studies of superintendent attitudes about selection criteria and selection committee membership, (c) criteria for setting architectural fees, and (d) factors contributing to superintendent satisfaction. In addition, Indiana policymakers were encouraged to require local school districts to use competitive selection procedures.
机译:这项研究的目的是研究选择印第安纳州1997年和1998年200万美元或更多的学校建筑项目的建筑公司。该研究报告了建筑选择标准的排名。此外,该研究还分析了建筑选择程序,建筑费用,受访者对建筑服务和最终产品的满意程度以及选择中的包容性。;使用国家记录来确定两年期间批准的项目。通过总监或他们的指定人完成的调查收集了81%的项目的其他数据。该研究报告的主要发现包括:(1)支付给建筑师的费用为建筑成本的3.2%至12.9%,其中平均费用为5.7%。 (2)在大约60%的研究项目中,受访者表示使用包容性选择程序聘用建筑师。 (3)不到三分之一的项目(29%)使用直接选择程序,因此无法使用选择委员会或不考虑一家以上的公司。 (4)两个最常用的选择标准是设计学校的经验和在预算范围内完成项目的声誉。 (5)发现与支付的费用有显着关联的唯一变量是对建筑服务的满意度。低费用类别的受访者对高度满意的回答比预期的要多。;结果表明,该州相当多的学校官员没有遵守公认的关于竞争性selection选和使用包容性selection选委员会的最佳做法。不能通过地区规模,地区财富,建筑项目的性质或所使用的选择程序来解释支付给建筑师的费用的巨大差异。建议在以下领域进行补充研究:(a)在其他州,(b)对总监关于selection选标准和selection选委员会成员的态度的定性研究,(c)设置建筑费的标准,以及(d)有助于总监满意的因素。此外,鼓励印第安纳州的决策者要求当地学区采用竞争性选拔程序。

著录项

  • 作者

    Nixon, Andrew Mark.;

  • 作者单位

    Ball State University.;

  • 授予单位 Ball State University.;
  • 学科 Educational administration.
  • 学位 Ed.D.
  • 年度 2002
  • 页码 100 p.
  • 总页数 100
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号