首页> 外文学位 >Public design in the culture of silent designers (Washington).
【24h】

Public design in the culture of silent designers (Washington).

机译:沉默的设计师文化中的公共设计(华盛顿)。

获取原文
获取原文并翻译 | 示例

摘要

This is a study of the design-build model executed not on private land and under private ownership but on land owned and financed by the public. The project in question took place on the State of Washington's Capitol Campus. Contracting out government services for both design management and construction to a single corporate entity is frequently referred to as privatization. This is a relatively new phenomenon, which emphasizes the alleged benefits of fixed project costs and on-time project delivery over traditional design-construction methods.; The lack of empirical information about the advantages or disadvantages of the design-build model in terms of a large-scale public project is a serious gap in the literature of American civic architecture. This case study examined public documents to reveal the decision-making processes used by key public officials (KPOs) in managing the design-build model as it applied to a large-scale state government project. There were 608 separate project communications linked to seven KPOs over a 74-month period. Every project communication in the database was recorded and coded for computer content analysis.; One of the major themes that emerged was the gap between what KPOs promised citizens and the actual outcome of privatization's developer/contractor-led design-build model. Documentary evidence indicated that the design-build model did save time but at the expense of citizen representation. Moreover, perhaps the most startling outcome was the loss of efficacy and design management control for many important project issues. This loss can be attributed in large part to the design-build model's organizational structure and its management strategies.; At least in this case the alleged benefits of the design-build model remain elusive. Furthermore, KPOs had little regard for the deregulating effect of privatization's developer/contractor-led design-build model on effective citizen representation in the public design context.
机译:这是对设计-构建模型的研究,该模型不是在私有土地上和私有制下执行,而是在公共拥有和资助的土地上执行。有问题的项目在华盛顿州国会大厦校园内进行。将用于设计管理和施工的政府服务外包给单个公司实体通常被称为私有化。这是一个相对较新的现象,它强调了固定项目成本和按时交付项目所带来的好处,超过了传统的设计施工方法。缺乏关于大规模公共项目的设计-建造模型的优缺点的经验信息,这是美国城市建筑文献中的一个严重空白。本案例研究检查了公共文档,以揭示关键公共官员(KPO)在管理设计-建造模型时所采用的决策过程,该模型应用于大型州政府项目。在74个月的时间里,与七个KPO关联的608个项目通讯分别独立。记录数据库中的每个项目通讯并进行编码,以进行计算机内容分析。出现的主要主题之一是KPO向公民承诺的内容与私有化由开发商/承包商主导的设计建造模型的实际结果之间的差距。书面证据表明,设计建造模型确实节省了时间,但以公民代表权为代价。而且,最令人震惊的结果可能是许多重要项目问题的功效和设计管理控制权的丧失。这种损失在很大程度上可以归因于设计建造模型的组织结构及其管理策略。至少在这种情况下,设计-构建模型的所谓好处仍然难以捉摸。此外,KPO很少考虑私有化的开发人员/承包商主导的设计构建模型对公共设计环境中有效公民代表制的放松作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号