首页> 外文学位 >Navigational models for effective and efficient interaction with integrated product and process models on construction sites.
【24h】

Navigational models for effective and efficient interaction with integrated product and process models on construction sites.

机译:导航模型,可与建筑工地上的集成产品和过程模型进行有效和高效的交互。

获取原文
获取原文并翻译 | 示例

摘要

In recent years, emerging mobile computing devices have become usable on construction sites and provide a medium to make project management information available directly at the work face of a construction site. Moreover, such devices support data collection for project management tasks and eliminate post-processing of information gathered on a construction site with paper-based solutions.; Navigational models serve as a vehicle to provide usable representations of project management information that is contained in integrated product and process models. These representations are flexible with respect to the level of detail and the type of the representation (list, 2D or 3D representation). Moreover, navigational models allow customization of what information of a large product and process model is made available to the user, and therefore reduce the size and the complexity of the representations with which a user has to interact on a construction site.; The navigational model approach has been implemented in the prototype software Site Data Collection System (SiDaCoS) and has been validated for the project management tasks of progress monitoring and the creation and administration of punch lists. The approach is general and may potentially also support other project management tasks, such as cost control and document management. In the validation of the system, it was shown that data access and data collection tasks on construction sites can be performed with SiDaCoS effectively and more efficiently than with systems that do not implement navigational models. In all considered test cases, SiDaCoS could provide the needed representations that allowed efficient interaction with project management data. The system can therefore make mobile computing devices useful tools for project management tasks and eliminate cumbersome and error prone paper-based data access and data collection solutions on construction sites. (Abstract shortened by UMI.)
机译:近年来,新兴的移动计算设备已经在建筑工地上变得可用,并且提供了一种使工程管理信息直接在建筑工地的工作面可用的介质。此外,此类设备支持用于项目管理任务的数据收集,并通过纸质解决方案消除了对在建筑工地上收集的信息的后处理。导航模型充当提供包含在集成产品和过程模型中的项目管理信息的可用表示形式的工具。这些表示形式在细节级别和表示形式(列表,2D或3D表示形式)方面具有灵活性。此外,导航模型允许定制向用户提供大型产品和过程模型的哪些信息,从而减小了用户在建筑工地上必须与之交互的表示的大小和复杂性。导航模型方法已在原型软件站点数据收集系统(SiDaCoS)中实现,并且已针对进度监控以及创建和管理打孔列表的项目管理任务进行了验证。该方法是通用的,并且可能还支持其他项目管理任务,例如成本控制和文档管理。在系统验证中,表明与未实施导航模型的系统相比,使用SiDaCoS可以更有效地执行建筑工地上的数据访问和数据收集任务。在所有经过考虑的测试案例中,SiDaCoS都可以提供所需的表示形式,以实现与项目管理数据的高效交互。因此,该系统可使移动计算设备成为用于项目管理任务的有用工具,并消除了建筑工地上繁琐且易于出错的基于纸张的数据访问和数据收集解决方案。 (摘要由UMI缩短。)

著录项

  • 作者

    Reinhardt, Jan.;

  • 作者单位

    Carnegie Mellon University.;

  • 授予单位 Carnegie Mellon University.;
  • 学科 Engineering Civil.; Computer Science.
  • 学位 Ph.D.
  • 年度 2003
  • 页码 231 p.
  • 总页数 231
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;自动化技术、计算机技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号