声明
Acknowledgements
摘要
ABSTRACT
Content
Abbreviations
1.Introduction
1.1 Background and Significance
1.2 PPP Mode Research Status
1.3 Research Content and objectives
1.4 Research Methodology
2.Public-Private Partnership Concept and Principles
2.1 Historical Background and Concept
2.1.1 Historical Background of PPP
2.1.2 PPP Concept
2.2 Importance of PPP mode
2.3 PPP:Type,Characteristics,Advantages and Limitations
2.3.1 PPP Types
2.3.2 PPP different Characteristics
2.3.3 Advantages
2.3.4 Limitations
2.4 Conclusion
3.PPP Implementation Process and Investment Comparator for Infrastructure
3.1 Concept of Infrastructure
3.2 The Need of PPP in Infrastructure
3.3 PPP Implementation Process in Infrastructure
3.3.1 Development phase of the Project
3.3.2 Risk Treatment
3.3.3 Typology of Risk
3.3.4 Contractual Framework Finalization and Agreement Execution
3.4 Selection of Partners and Operators
3.5 Financial Closure
3.6 Analysis of Investment Criteria for Engineering Project
3.6.1 Value for Money (VFM)
3.6.2 VFM Factor in PPP
3.6.3 PPP Operational Plan and Assessment for VFM
3.7 Conclusion
4.Evaluation Method of PPP for Infrastructure Project Financing
4.1 Introduction
4.2 Infrastructure Financing Difficulties
4.3 Infrastructure Financing Safeness Analysis Technique
4.3.1 The Net Present Value Technique
4.3.2.Profitability Index (PI) (Benefit Cost Ratio)
4.3.3.Internal Rate of Return (IRR)
4.3.4 Payback period Technique
4.4 Conclusion
5.Evaluation of PPP in Road Infrastructure Financing Case study:China Southern Region Road
5.1 Introduction
5.2 Project Background
5.3 Project Estimation and Partner Funding
5.3.1 Project Financial Estimation
5.3.2 Partners Investment Percentage
5.4 Project Operating period Cost
5.5.Investment Evaluation of China Southern Road Project
5.5.1.Financial Evaluation Index for BOT
5.5.2 The China Southern Road Project Financing Evaluation Parameters
5.5.3.Traffic Provision and Schedule
5.6.1 Determination of the Internal Rate of Return (IRR)
5.6.2 Evaluation of Net Present Value (NPV)
5.6.3.Profitability Index (PI) (Benefit Cost Ratio)
5.6.4 Calculation of the Payback Period
5.7 Project Risk Analysis and Countermeasures
5.7.1 Overview
5.7.2 Risk in the Project
5.7.3 Risk assessment Method
5.7.4 Risk Countermeasures
5.8 Conclusion
6.1 Conclusion
6.2 Research Scope and Limitation
6.3 Further Studies
References
学位论文数据集