1 Introduction
1.1. Research Background and Significance(研究背景与意义)
1.2 Summary of Research Status Review at Home and Abroad(国内外研究现状)
1.3 Main Research Contents and Methodology(研究内容与技术路线)
1.4 Expected Main Results(预期成果)
2 Basic Principles for Key Technology of Integration of Coal Mining–Gangue Washing–Gob Backfilling(采选充采一体化技术原理)
2.1. Technology Connotation of Integration Separation and Backfilling in Coal Mining(井下采选充采一体化技术内涵)
2.2 Key Technical of underground Mining-Gangue Washing-Gob Backfilling(井下采选充采一体化技术关键)
2.3 Major Problems and Condition of Mine XII(平煤十二矿技术难点)
3 Design of Support in Underground Large Sectional Sorting Chamber(井下大断面洗选洞室支护设计)
3.1. Sorting Cavern Design(大洞室支护设计)
3.2 Model Building of Numerical Simulation(数值模型的建立)
3.3 Simulation Analysis of Large Sectional Sorting Chamber about the Construction Sequence (模拟结果分析)
4. Equipments Used in Backfilling and Coal Gaunge Separation(井下采选充采一体化关键设备)
4.1. Key Equipments used in Underground Backfilling(充填采煤关键设备)
4.2. Equipments used for Underground Separation(井下煤矸分选关键设备)
5. Engineering Application and Efficiency Analysis at Ping Ding Shan Mine XII(工程应用)
5.1 Lithology and Geological Conditions of the Area(矿井概况)
5.2 System Arrangement of Integration Separation and Filling (采选充采系统布置)
5.3 Underground Separation System at Mine XII(井下洗选系统)
5.4 Engineering Application Effects and Economic Benefit Analysis (应用效果分析)
6. Main Conclusion (主要结论)