英文文摘
论文说明:List of Figures、List of Tables
声明
CHAPTER 1: INTRODUCTION
1.1 Grid Computing Context
1.2 Grid Computing Environment
1.3 Resource Management and Job Scheduling in Grid Environment
1.4 Economic Based Grid Computational Context
1.5 Motivation
1.6 Contribution
1.7 Thesis Organization
CHAPTER 2: RESOURCE MANAGEMENT AND JOB SCHEDULING
2.1 Introduction
2.1.1 Resource Management Challenges
2.2 Requirements for Grid Resource Management
2.3 Classification for Resource Management System (RMS)
2.3.1 Computational Grid
2.3.2 Data Grid
2.3.3 Service Grid
2.4 Resource Management System Taxonomy
2.4.1 Scheduling
2.4.2 Scheduling Policy
2.5 Previous Work and Survey on Grid Resource Management Systems
2.5.1 Globus: A Toolkit for Grid Computing
2.5.2 Condor: Cycle Stealing Technology for High Throughput Computing
2.5.3 Nimrod/G: A Grid Resource Broker
2.6 The Role of Computational Economy in Resource Management and Job Scheduling
2.6.1 Computational Economy Framework
2.6.2 Economic Models in a Grid Context
2.6.3 Challenges and Requirements for Economic-Based Grids
2.6.4 Grid Architecture for Computational Economy (GRACE)
2.7 Summary
Chapter 3: Fault Tolerant Quality Aware Resource Scheduling Strategy in Computational Economy Based Grid Framework
3.1 Introduction
3.2 Grid based Economic Model Context
3.3 The System Model
3.3.1 Application model and Resources entities
3.3.2 Resource Trading Context
3.4 Adaptive Fault-Tolerant Resource Scheduling Architecture
3.4.1 Fault-Tolerance
3.4.2 Related Work
3.5 System Architecture
3.5.1 Resource Management Model
3.5.2 Proposed Adaptive Fault-tolerant Scheduling Strategy
3.5.3 Fault-tolerant Approach
3.5.4 Grid Resource Broker
3.6 Experimental Results and Evaluation
3.6.1 Simulation Environment
3.6.2 Simulation Results and Discussion
3.7 Summary
CHAPTER 4: SIMULATION AND EXPERIMANTAL RESULTS
4.1 GridSim Simulation Environment
4.1.1 GridSim Entities
4.2 Designing and Implementing Resource Failures into GridSim
4.3 Interaction Protocols among Grid Entities for communication
4.4 Experimental Setup
4.4.1 Characteristics of Resources Simulated
4.4.2 Specifications of Users Jobs
4.5 Experiment Results and Discussion
4.5.1 Experiment Ⅰ: Fixed deadline/Variable budget
4.5.2 EXperiment Ⅱ Fixed budget/Variable deadline
4.5.3 Experiment Ⅲ: % of Deadline Time Utilized (Fixed Deadline)/Variable Budget
4.5.4 Experiment Ⅳ: Fixed budget and Jobs/Variable task granularity (task size)
4.6 Summary
CONCLUSION AND FUTUER DIRECTION
REFERENCES
PUBLICATIONS
ACKNOWLEDGEMENT
APPENIX