【24h】

PRESSURE OBSERVATION FOR THE 1# ORIFICE TUNNEL IN XIAOLANGDI PROJECT

机译:小浪底工程1#孔洞压力观测。

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the field pressure observation for 1# orifice tunnel in Xiaolangdi Project with the reservoir water level of 210m. The time-average pressure and pulsation pressure on the wall has been given with the full opening and partial openings of gate. A notable energy dissipation result for three orifices has been achieved with the dissipating coefficients of 1.19, 0.57 and 0.63. The field observation results also show a good agreement with the model test. The measured pressures will be used for the cavitation analyses for the orifice tunnel together with cavitation observation.
机译:介绍了小浪底工程1#孔口水库水位为210m的现场压力观测结果。壁的时间平均压力和脉动压力已通过闸门的全部打开和部分打开给出。在耗散系数为1.19、0.57和0.63的情况下,三个孔的能量耗散效果显着。现场观察结果也与模型试验吻合良好。测得的压力将与孔蚀现象一起用于孔道孔的孔蚀分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号