首页> 外文会议>World water and environmental resources congress 2003 and related symposia >Increasin Public Understanding of Water Management Criteria
【24h】

Increasin Public Understanding of Water Management Criteria

机译:公众对水管理标准的了解

获取原文
获取原文并翻译 | 示例

摘要

The majority of the 16 federal reservoir projects operated by the Pittsburgh District of the U.S. Army Corps of Engineers were authorized by the Flood Control Act of 1936. These dams were built primarily for the purposes of reducing flood stages (flood control) and providing low water regulation for water quality control along the Allegheny, Monongahela, and upper Ohio Rivers. After these dams were placed in operation, Congress granted general authority to all Corps reservoirs for the following limited purposes: recreation; municipal and industrial water supply; fish and wildlife conservation; water quality control; and threatened and endangered species preservation. However, none of these laws specifically allocated water in the Lakes or changed operational criteria for any of these added purposes. The legislation generally states that the dam will be operated in such a manner as will protect and enhance these purposes and to the extent that they are compatible with other project purposes. rnRecently, there has been a growing demand by the public and others to change the operating criteria of federal dams in order to better meet current needs. rnOne way to review the operation of a Corps facility is under the existing authority of Section 216 of Public Law (PL) 91-611. Under this Section the Corps can review the operation of its lakes and report to Congress with recommendations on the advisability of making a modification in the overall public interest. rnWe currently are utilizing the Section 216 authority at Youghiogheny River Lake in western Pennsylvania. In this effort we are formally reallocating the storage of the facility through a modification of the release schedule from low water regulation for water quality control to water supply. We are nearing completion of the feasibility phase, and our cost-sharing partner has expressed their intent to purchase the associated storage. However, public involvement, specifically public education has proved to a huge challenge for the study team. rnThis paper will discuss the District’s current storage and release schedules against the backdrop of improved water quality in the watershed, and the needs of the area's competing water users. The paper will discuss the reallocating of storage to serve water supply and recreational needs, while positioning the region to be more responsive to anticipated future water use in the watershed. And finally, the paper will focus on the lessons learned in public education.
机译:由美国陆军工程兵兵团的匹兹堡区运营的16个联邦水库项目中,大多数是根据1936年《防洪法》授权的。这些水坝的建造主要是为了减少洪水(防洪)和提供低水位阿勒格尼河,莫农加希拉河和俄亥俄河上游的水质控制法规。这些大坝投入运营后,国会出于以下有限目的将所有军团水库的一般权限授予:市政和工业供水;鱼类和野生动植物保护;水质控制;以及威胁和濒危的物种保护。但是,这些法律都没有专门为湖泊中的水分配或更改任何这些新增用途的操作标准。立法通常规定,大坝的运营方式应能保护和增强这些目的,并在一定程度上使其与其他项目目的兼容。最近,公众和其他人士对改变联邦大坝的运行标准以更好地满足当前需求的需求不断增长。 rn检查军团设施运行的一种方法是根据《公法》(PL)91-611第216条的现有授权。在本节下,兵团可以审查其湖泊的运行情况,并向国会报告,并提出对整体公共利益进行修改的建议。 rn我们目前正在利用宾夕法尼亚州西部的Youghiogheny River Lake的216节授权。在这项工作中,我们将通过修改排放时间表(从用于控制水质的低水量法规到供水)来正式重新分配设施的存储空间。我们已接近完成可行性研究阶段,我们的费用分摊合作伙伴已表示有意购买相关的存储。然而,事实证明,公众的参与,特别是公众教育对研究团队构成了巨大挑战。 rn本文将在流域水质改善以及该地区竞争用水者的需求的背景下,讨论该地区当前的存储和发布时间表。本文将讨论为满足供水和娱乐需求而对存储进行重新分配的方法,同时将区域定位为对分水岭的未来预期用水量更加敏感。最后,本文将重点介绍在公共教育中吸取的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号