EXCESS DREDGING: IMPLICATIONS FOR NEGOTIATING ENVIRONMENTAL DOCUMENTS

机译:过度挖泥:谈判环境文件的含义

获取原文
获取原文并翻译 | 示例

摘要

The USACE has long recognized in its development of technical guidance documents and regulations for channel design, dredging operations and contracting that there are inherent excavation accuracy limitations in the dredging process. As a result of dredging equipment capabilities and limitation, excess dredging will occur below the allowable overdepth within the context of the current standard of 1 to 2 foot allowable overdepth. The extent of excess dredging is influenced by the dredging equipment, as well as the physical characteristics of the material to be dredged (new work vs maintenance), the project physical conditions (tides, currents, waves, debris), channel design (water depth), and operator skill. Further the measurement precision of bathymetric surveys complicates defining the extent of any dredging in excess of the environmental documents and permits.The primary purpose of this paper is to provide the dredging project manager seeking a dredging permit technical information and possible language to assist in negotiating a permit that is within dredging equipment capabilities. The use of the contractual definition of allowable overdepth as the permitted dredging limit often results in a permit requirement that is impossible for standard dredging equipment to meet. It can also impose an additional financial burden on the project that is not justified based on the related environmental impacts.The suggested remedy to avoid problems of permit compliance, and excessive overdredgmg is to accept the fact of dredging depth accuracy (or inaccuracy) in both the permit and the dredging contract. The permit language can then be crafted to limit excess dredging to isolated, small areas. There is the need to develop permit language that addresses the regulatory concern(s), yet allows areas of excess dredging that will occur from a combination of equipment characteristics, operator skill and project physical conditions. To meet these goals, the allowable overdepth for permit compliance (as reflected in the final project survey) could be measured in one or a combination of the following ways (excluding side slopes):1. Limiting excess dredging based on volume, either as a percentage of the total project or as a percentage of the allowable overdepth not dredged.2. Limiting excess dredging based on area, as a percentage of the total project area, excluding slopes.3. Limiting excess dredging based on average depth, weighted by area.
机译:USACE在开发用于通道设计,疏ging操作和承包的技术指导文件和法规中早已得到认可,在疏ging过程中存在固有的开挖精度限制。由于挖泥设备的功能和局限性,在当前标准为1到2英尺的允许超深度范围内,会在允许的超深度以下进行过量挖泥。疏excess的程度受疏equipment设备,疏the材料的物理特性(新工作与维护),项目物理条件(潮汐,水流,波浪,碎屑),渠道设计(水深)的影响。 )和操作员技能。水深测量的测量精度进一步使定义超出环境文件和许可证的任何疏extent程度变得复杂。本文的主要目的是为疏project项目经理提供寻求疏permit许可证的技术信息和可能的语言,以帮助进行协商。允许在挖泥设备能力范围内。使用合同约定的允许的深度作为允许的挖泥极限,通常会导致标准的挖泥设备无法满足的许可要求。它也可能给项目带来额外的财务负担,而该财务负担基于相关的环境影响是不合理的。建议的补救措施是避免许可证合规的问题以及过多的过度使用,这是要接受双方都疏depth深度准确性(或不准确性)的事实许可证和疏contract合同。然后可以设计许可证语言,以将过多的挖泥限制在孤立的小区域。有必要开发许可证语言,以解决监管问题,同时允许因设备特性,操作员技能和项目物理条件的组合而发生的过多挖泥区域。为了实现这些目标,可以通过以下一种或多种方式(不包括边坡)来衡量许可合规性的允许超深度(如最终项目调查所示):1。根据工程量限制过量挖泥,占整个项目的百分比或未挖泥的允许深度的百分比2。根据面积限制过量挖泥,占工程总面积的百分比,不包括斜坡3。根据平均深度限制过度挖泥,并按面积加权。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号