首页> 外文会议>World Organization of Dredging Associations(WODA) World Dredging Congress; 20070527-0601; Lake Buena Vista,FL(US) >MANAGEMENT OF ENVIRONMENTAL ISSUES RELATED TO CAPITAL DREDGING WORKS AT PORT KLANG, MALAYSIA
【24h】

MANAGEMENT OF ENVIRONMENTAL ISSUES RELATED TO CAPITAL DREDGING WORKS AT PORT KLANG, MALAYSIA

机译:与马来西亚KLANG港口的挖泥工程有关的环境问题的管理

获取原文
获取原文并翻译 | 示例

摘要

Port Klang is Malaysia's leading port with two main navigational entrances / exits. The Northern Pulau Angsa Approach is via the dredged North Channel, 153 meters wide with maintained declared depth of 11.3 meters below Chart Datum (m CD). The Southern approach lies adjacent to the North bound lane of the Malacca Straits Traffic Separation. The South Channel has a width of 365 meters with a maintained declared depth of 15.5 m below CD.Capital dredging work is proposed in order to upgrade the North access channel to the same width and a declared depth of 365 meters & 15.5m below CD respectively as that of the Southern approach. The capital dredging volume involved is approximately 39 million cubic meters.The mainland bordering the port is the most developed region in the country. Mangrove forests cover the undeveloped coastal zones within and at areas bordering the port. Inter tidal mud flats and natural islands off the port provide protection and environmental buffer zones. The gazetted port area and its surroundings also include numerous fishing villages, cage fish farms, cockle breeding farms and artificial reefs to promote natural fish breeding.The port area is a multi user environment with significant natural buffer zones. Hence implementation of this major capital dredging project requiring relocation of very large quantities of dredged materials will cause multi-user conflicts, socio-economic impacts as well as concerns for environmental protection.Adequate studies, investigations and planning have been carried out to identify and address all issues on environmental impacts, environmental monitoring and mitigation measures to be adopted for the successful implementation of the project with minimal impact. This paper addresses at macro level, the management of environmental issues related to the successful implementation of the capital dredging project at Port Klang.
机译:巴生港口是马来西亚的主要港口,有两个主要的导航入口/出口。北普劳昂沙途径是通过疏North的北海峡,该海峡宽153米,声明的深度保持在海图基准面(m CD)以下11.3米。南部进路毗邻马六甲海峡交通隔离区北行车道。南通道的宽度为365米,声明的深度保持在CD下方15.5 m。建议进行挖泥工程,以将北通道的宽度升级为相同的宽度,声明深度分别低于CD的365米和15.5 m就像南方的做法一样疏capital工程涉及的资金约为3900万立方米。与港口接壤的大陆是该国最发达的地区。红树林覆盖了与港口接壤的沿海地区及其周边未开发的沿海地区。港口之间的潮间带泥滩和自然岛提供了保护和环境缓冲带。在宪报刊登的港口区及其周围地区还​​包括许多渔村,网箱养鱼场,鸟蛤繁殖场和人工鱼礁,以促进天然鱼的繁殖。该港口区是一个多用户环境,拥有大量的自然缓冲区。因此,执行这个需要大量疏dr材料的大型资本疏project项目的实施将导致多用户冲突,社会经济影响以及对环境保护的关注。已经进行了充分的研究,调查和规划,以识别和解决有关环境影响的所有问题,环境监测和缓解措施,以成功地以最小的影响成功实施该项目。本文从宏观层面探讨了与成功实施巴生港资本疏project项目有关的环境问题的管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号