HEAD OF HYLEBOS-ADAPTIVE MANAGEMENT DURING SEDIMENT REMEDIATION

机译:底泥修复过程中的适应系统管理负责人

获取原文
获取原文并翻译 | 示例

摘要

Major sediment remediation projects can take place over a large area, over an extended period of time, and involve a wide range of variable site conditions. Successful completion of such complex projects can be enhanced by a flexible management framework that encourages ongoing adaptation of the remediation methods through continuous gathering and review of performance data, followed up by real time method adjustments to improve the effectiveness of the remedial action. The application of adaptive management to sediment remedial actions provides a mechanism to improve the effectiveness of the planned action by learning from the outcomes of ongoing actions and modifying the actions to achieve the desired outcome, as well as a means to respond quickly to unanticipated conditions.One of the ways the Head of Hylebos Waterway sediment remediation project applied adaptive management was by the full-time observation of the dredging and subsequent sampling with concurrent adjustment of the dredging plan to improve the capture of impacted sediment and achieve a clean bottom throughout the dredging area. This approach resulted in 99% of the dredging area meeting the project chemical cleanup criteria, with 1 % of the area requiring capping to control a groundwater related impacts that could not be resolved by sediment removal.
机译:重大的泥沙治理项目可能会在很长的一段时间内在大范围内进行,涉及范围广泛的现场条件。可以通过灵活的管理框架来增强此类复杂项目的成功完成,该框架鼓励通过不断收集和查看绩效数据来不断调整补救方法,随后进行实时方法调整以提高补救措施的有效性。适应性管理在沉积物补救措施中的应用提供了一种机制,可通过从正在进行的措施的结果中学习并修改措施以实现所需的结果,从而提高计划措施的有效性,以及快速应对意外情况的手段。 Hylebos水路泥沙修复项目负责人采用适应性管理的方法之一是,对挖泥进行全时观察,随后进行取样,同时对挖泥计划进行调整,以改善对受影响泥沙的捕获,并在整个挖泥过程中保持底部清洁区域。这种方法导致99%的疏ging区域达到了项目化学清理标准,其中1%的区域需要加盖以控制与地下水相关的影响,而这些影响无法通过沉积物清除解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号