CLOSURE CONCEPTS FOR HART-MILLER ISLAND DREDGED MATERIAL CONTAINMENT FACILITY

机译:HART-MILLER岛抵押材料保管设施的关闭概念

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Construction of the Hart-Miller Island (HMI) dredged material containment facility was completed in 1984. The facility was designed to safely contain dredged material from Baltimore Harbor shipping channels and berthing areas. The approximately 445-hectare (1100-acre) site is divided into two cells, the North Cell, 324 hectare (800 acres) and South Cell, 121 hectare (300 acres). In 1990, dredged material placement ceased in the South Cell and it lay idle for about eleven years. From 2002 to 2006, the South Cell underwent an environmental restoration project. Currently, the South Cell serves to provide valuable habitat to a large number of resident and migrating bird species, including some on the Maryland State rare, threatened, and endangered species list.The State of Maryland passed legislation that requires final closure of HMI with transfer of property and management to the Maryland Department of Natural Resources (DNR). Closure will begin after filling of the site with dredged material ceases at the end of 2009. However, before the HMI facility can be transferred to DNR, the Maryland Port Administration (MPA) intends to close the facility according to the site's master plan, which specifies that HMI shall be restored to provide valuable wildlife habitat and public opportunities for passive recreation.There are numerous challenges in closing a site like HMI; a relatively large flat site, fine-grained sediments that exhibit low strengths, estuarine sediments high in sulfide that can acidify and mobilize heavy metals and little precedent to use as guidance. Consequently, the MPA commissioned a study team to develop a variety of closure concepts ranging from completely flooded to mostly uplands. This paper summarizes the significant findings and recommendations of the HMI north cell closure study team and provides much insight into the development of a highly complex set of design requirements for closure of this type of facility.
机译:哈特米勒岛(HMI)疏dr物料围堵设施的建设已于1984年完成。该设施的设计目的是安全地容纳巴尔的摩港航运渠道和停泊区的疏material物料。约445公顷(1100英亩)的土地分为两个单元,北单元324公顷(800英亩)和南单元121公顷(300英亩)。 1990年,疏Cell物料的放置不再在South Cell中进行,它闲置了大约11年。从2002年到2006年,South Cell进行了一项环境修复项目。目前,南方牢房(South Cell)可为大量居民鸟类和迁徙鸟类提供有价值的栖息地,其中包括马里兰州珍稀,濒危和濒危物种清单上的某些鸟类。马里兰州通过了一项立法,要求通过转让最终关闭HMI马里兰州自然资源部(DNR)的财产和管理。关闭工作将在2009年底停止用挖泥物填充场地后开始。但是,在将HMI设施移交给DNR之前,马里兰州港口管理局(MPA)打算根据场地的总体规划关闭该设施。规定要恢复HMI,以提供宝贵的野生动植物栖息地和公共机会进行被动娱乐活动。相对较大的平坦地点,细粒状沉积物,强度低,硫化物含量高的河口沉积物,可酸化和移动重金属,几乎没有先例可作为指导。因此,MPA委托一个研究小组来开发各种封闭概念,从完全淹没到大部分为高地。本文总结了HMI北单元封闭研究团队的重要发现和建议,并为封闭此类设施的一组高度复杂的设计要求的开发提供了很多见识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号