首页> 外文会议>Western Regional meeting >Offset steam injection shut-in guidelines during drilling operations: south belridge field case study
【24h】

Offset steam injection shut-in guidelines during drilling operations: south belridge field case study

机译:钻井作业中偏移蒸汽注入的关闭准则:South Belridge现场案例研究

获取原文
获取原文并翻译 | 示例

摘要

Offset steam injection wells within a certain radius are typically shut in within a certain time period before drilling an in-field (increased density or replacement) well. The basis of this practice is that the reservoir pressure will eventually decrease to a minimum value, allowing drilling to proceed without problems. A study was undertaken to develop injection shut-in guidelines which consider specific reservoir conditions such as pressure, pattern size, and steamflood maturity.
机译:一定半径范围内的偏移蒸汽注入井通常在钻井(增加密度或更换井)之前的一定时间内关闭。这种做法的基础是,储层压力最终将降低到最小值,从而使钻井顺利进行。进行了一项研究,以制定注入关闭准则,其中考虑了特定的储层条件,例如压力,井眼尺寸和蒸汽驱成熟度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号