首页> 外文会议>Western Regional meeting >Offset steam injection shut-in guidelines during drilling operations: south belridge field case study
【24h】

Offset steam injection shut-in guidelines during drilling operations: south belridge field case study

机译:钻探操作期间抵消蒸汽喷射简关指南:南方贝尔里奇现场案例研究

获取原文

摘要

Offset steam injection wells within a certain radius are typically shut in within a certain time period before drilling an in-field (increased density or replacement) well. The basis of this practice is that the reservoir pressure will eventually decrease to a minimum value, allowing drilling to proceed without problems. A study was undertaken to develop injection shut-in guidelines which consider specific reservoir conditions such as pressure, pattern size, and steamflood maturity.
机译:在钻井内钻井(增加密度或更换)之前通常在一定时间内关闭某个半径内的偏移蒸汽喷射孔。这种做法的基础是储层压力最终将减少到最小值,允许钻井继续存在。开展了一项研究,以开发注射储存指南,以考虑特定的储层条件,如压力,图案规模和蒸汽成熟度。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号