首页> 外文会议>WEFTEC 2001;Annual conference exposition of Water Environment Federation >Water Quality Variance for the Charles River: An On-Going Example of theProcess for Water Quality Standards Revisions for CSO-Impacted Waters
【24h】

Water Quality Variance for the Charles River: An On-Going Example of theProcess for Water Quality Standards Revisions for CSO-Impacted Waters

机译:查尔斯河的水质差异:实施CSO的水的水质标准修订过程的一个持续示例

获取原文
获取原文并翻译 | 示例

摘要

The Massachusetts Water Resources Authority (MWRA) completed its Long-TermrnControl Plan for CSO control (LTCP) in 1997. The plan used a watershed approach tornassess the impacts of CSO in the context of other sources of pollution in the watershed,rnincluding stormwater and upstream flow. The recommended plan proposed to eliminaternCSO to critical use areas, and cost-effectively minimize CSO in non-critical use areas.rnRegulatory acceptance of the plan was contingent upon changing existing water qualityrnstandards in areas where CSO would remain. At the time that the LTCP was beingrndeveloped, the state water quality standards were being revised to establish a categoryrnunder which minimized CSO discharges could remain, provided that certain specificrnconditions were met. Based on the MWRA’s LTCP, the United States EnvironmentalrnProtection Agency and the Massachusetts Department of Environmental Protectionrnagreed to revise the water quality standards for certain waters within Boston Harbor, butrnthe two agencies did not agree on the methodology for meeting the criterion forrn“substantial and widespread social and economic impact”. For the Charles River, a twoyearrnwater quality variance was granted to allow further study of the impacts of non-CSOrnsources of pollution, as well as for additional CSO control alternatives, prior to a finalrndetermination of the water quality standard. To date, certain conditions of the variancernhave been completed, while others are on-going. Key on-going variance activitiesrninclude: an assessment of providing additional CSO storage; a performance evaluation ofrnthe MWRA’s Cottage Farm CSO Facility, which discharges to the Charles River;rndevelopment of a more detailed stormwater runoff model for areas tributary to thernCharles River; and upgrading the receiving water model for the Charles River.
机译:马萨诸塞州水资源管理局(MWRA)于1997年完成了其CSO控制长期控制计划(LTCP)。该计划采用分水岭方法对流域其他污染源(包括雨水和上游污染)的环境中CSO的影响进行了评估。流。建议的计划提议消除关键用途区域的CSO,并以成本有效的方式将非关键用途区域的CSO最小化。对该计划的监管接受取决于更改仍将保留CSO区域的现有水质标准。在开发LTCP时,正在修订州水质标准以建立一个类别,在该类别下,只要满足某些特定条件,就可以保持最少的CSO排放量。根据MWRA的LTCP,美国环境保护署和马萨诸塞州环境保护署同意修改波士顿港内某些水域的水质标准,但是两个机构并未就满足“实质性和广泛的社会标准”的方法达成共识。和经济影响”。对于查尔斯河,在最终确定水质标准之前,授予了两年水质差异以允许进一步研究非CSO污染源的影响以及其他CSO控制替代方案。迄今为止,方差的某些条件已经完成,而其他条件仍在进行中。正在进行的主要差异活动包括:对提供额外的CSO存储的评估; MWRA的农舍CSO设施向查尔斯河排放的性能评估;为查尔斯河支流地区开发了更详细的雨水径流模型;并升级查尔斯河的接收水模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号