首页> 外文会议>Water Environment Federation 76th annual technical exhibition and conference (WEFTEC 2003) >OCEAN OUTFALL REPAIR TECHNIQUE OFFERS REDUCED RISK AND ECOLOGICAL BENEFITS
【24h】

OCEAN OUTFALL REPAIR TECHNIQUE OFFERS REDUCED RISK AND ECOLOGICAL BENEFITS

机译:海洋外翻维修技术可降低风险和生态效益

获取原文
获取原文并翻译 | 示例

摘要

The City of Hollywood is responsible for the Hollywood Southern Regional Wastewater Treatment Plant, which is rated at 42 million gallons per day and discharges secondary treated effluent to the Atlantic Ocean via a 60-inch ocean outfall. The outfall is currently the primary method of effluent disposal for the treatment plant. rnAfter the passage of Hurricane Andrew in 1992, the outfall required rehabilitation of its cover material over four discrete problem areas comprising a total of approximately 4,000 feet. An articulated concrete mat was chosen at that time to effect repair of the armor covering. Use of the concrete mats offered several advantages over the traditional armor rock, the most notable of which was a more stable cover material that was quicker to install. Adjoining mats were connected together with polyester cable, forming a contiguous repair. The rehabilitation was completed in late 1994. A subsequent inspection of the outfall was performed in May of 1997 to document the integrity of the cover material. At that time, no damage was found to either the original armor rock cover material or the rehabilitated cover material. Because Hurricane Irene, which passed through south Florida on October 15, 1999, caused an estimated $120 million in damage in Miami-Dade County alone, the City of Hollywood conducted another inspection of the outfall in March 2000.rnThe results of the inspection found a substantial amount of the original cover material was missing and that the outfall was visibly exposed in various areas. No visible leaks were found and all exposed pipe appeared to be in good condition. All areas previously repaired with the articulated concrete mat appeared in good condition and exhibited substantial marine growth. Based upon the inspection results, the exposure was not deemed to be extensive and totaled about 82 feet in length. The single largest area in need of repair was approximately 24 feet in length and contained one exposed pipe joint. rnOptions for the extent of repair/rehabilitation were developed and compared as a function of relative risk of continued cover material loss, cost and construction time. Selection of an alternative to implement depended upon available funding and judgment as to the value of the expense versus its corresponding reduced risk. The resistance of the previous repair to storm damage was highlighted.
机译:好莱坞市政府负责好莱坞南部区域废水处理厂的建设,该厂的日处理量为4200万加仑,并通过60英寸的海洋排放口将二次处理后的废水排放到大西洋。排污口是目前处理厂污水处理的主要方法。 rn在1992年安德鲁飓风过后,排污口需要对覆盖约4000英尺的四个离散问题区域进行覆盖材料的修复。当时选择了一个铰接的混凝土垫来修复装甲覆盖层。与传统的装甲岩石相比,混凝土垫的使用具有许多优势,其中最引人注目的是更稳定的表皮材料,安装速度更快。相邻的垫子用聚酯电缆连接在一起,形成连续的修复。修复工作于1994年底完成。随后于1997年5月对排水口进行了检查,以记录表皮材料的完整性。当时,原始装甲岩石覆盖材料或修复后的覆盖材料均未发现损坏。由于1999年10月15日穿过佛罗里达南部的艾琳飓风仅在迈阿密戴德县就造成了约1.2亿美元的损失,好莱坞市政府于2000年3月对排污口进行了另一次检查。大量的原始封面材料丢失了,并且排水口明显暴露在各个区域。没有发现可见的泄漏,所有裸露的管道都处于良好状态。先前用铰接混凝土垫修复的所有区域均状况良好,并显示出可观的海洋生长。根据检查结果,该次曝光不算是广泛的,总长度约为82英尺。需要维修的最大区域约为24英尺长,其中包含一个裸露的管接头。 rn制定了维修/修复程度的选项,并根据覆盖材料持续损失,成本和施工时间的相对风险来进行比较。选择一种实施方案取决于可用的资金和对费用价值及其相应降低的风险的判断。强调了先前维修对风暴破坏的抵抗力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号