【24h】

INDUSTRIAL COMPLEX FOR SOLID RADWASTE MANAGEMENT AT CHERNOBYLE NUCLEAR POWERPLANT

机译:切尔诺贝利核电站固体废物管理的工业综合体

获取原文
获取原文并翻译 | 示例

摘要

In the framework of the preparation for the decommissioning of the Chernobyl Nuclear Power Plant (ChNPP) anrnIndustrial Complex for Solid Radwaste Management (ICSRM) will be built under the EC TACIS Program in thernvicinity of ChNPP, comprising:rn1. a solid waste retrieval facility (LOT 1),rn2. a solid waste processing plant (LOT 2) andrn3. a repository for the disposal of short-lived waste (LOT 3).rnAfter an International Tender the ICSRM Contract was awarded to RWE NUKEM GmbH. The Contract is arnturnkey project. It covers design, licensing support, fabrication, assembling, testing, inspection, delivery,rnerection, installation and commissioning of all three LOTs.rnLOT 1 comprises the installation of a retrieval facility for operational Low and Intermediate Level Short-LivedrnWaste (SILW-SL) and High Level Waste (HLW) currently stored in the XTO storage silo. Due to the Chernobylrnaccident, this storage also contains an unknown percentage of Long-Lived (LL) waste.rnLOT 2 comprises a plant for the sorting and segregation of all categories of solid radwaste and the processing ofrnthe solid LILW-SL generated from the previous retrieval activities (LOT 1) and from the routine operational andrndecommissioning activities of the ChNPP. LILW-SL will be packaged and immobilized for removal to the nearrnsurface disposal facility (LOT 3) whilst higher category wastes (LILW-LL and HLW) will be packaged, overpackedrnand stored in a temporary storage facility while awaiting the construction of an interim storage facility.rnLOT 3 comprises a near surface repository in the form of an engineered facility for the final disposal of LILWSLrnconditioned in LOT 2 and for wastes from other sources at Chernobyl in accordance with the requirements ofrnthe Ukrainian Nuclear Regulatory Authorities.rnThe paper will present the proposed concepts and their integration into existing buildings and installations.rnFurther, the paper will consider the safety cases, as well as the integration of Western and UkrainianrnOrganizations into a cohesive project team and the requirement to guarantee the fulfillment of both Westernrnstandards and Ukrainian regulations and licensing requirements.rnThe paper will provide information on the status of the interim design and the effects of value engineering on thernoutput of basic design phase. The paper therefor summarizes the design results of the involved design engineersrnof the Design and Process Providers BNFL (LOT 1), RWE NUKEM GmbH (LOT 2 and General) and INITECrn(LOT 3)
机译:在切尔诺贝利核电站(ChNPP)退役的准备框架内,将根据EC TACIS计划在ChNPP的附近建设一个固体废物管理工业综合体(ICSRM),包括:rn1。固体废物回收设施(批次1),rn2。一个固体废物处理厂(第二批)和rn3。在国际招标后,ICSRM合同授予了RWE NUKEM GmbH。该合同是arnturnkey项目。它涵盖所有三个LOT的设计,许可支持,制造,组装,测试,检查,交付,修复,安装和调试。rnLOT1包括安装用于操作中低水平短寿命废物(SILW-SL)的检索设施。当前存储在XTO存储仓中的高放废物(HLW)。由于切尔诺贝利事故,该存储还包含未知百分比的长寿命(LL)废物。LOT 2包括用于分类和分类所有类别固体废物的工厂,并处理先前回收产生的固体LILW-SL活动(第1批)以及ChNPP的日常运行和退役活动。 LILW-SL将被包装并固定以移至近地表处置设施(LOT 3),而较高等级的废物(LILW-LL和HLW)将被包装,超包装并在临时存储设施中存储,同时等待临时存储设施的建设.rnLOT 3以工程设施的形式包括近地表处置库,用于根据乌克兰核监管机构的要求最终处置在LOT 2中处理过的LILWSLrn和切尔诺贝利的其他来源的废物。本文将介绍拟议的概念进一步,本文将考虑安全案例,以及将西方和乌克兰组织整合为一个有凝聚力的项目团队,以及确保满足西方标准和乌克兰法规及许可要求的要求。 rn本文将提供有关临时设计和价值工程对基础设计阶段产出的影响。因此,本文总结了相关设计工程师的设计结果,包括BNFL(LOT 1),RWE NUKEM GmbH(LOT 2和General)和INITECrn(LOT 3)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号