IMPACT OF LACK OF CONSISTENT FREE RELEASE STANDARDS ON DECOMMISSIONING PROJECTS AND COSTS

机译:缺乏一致的免费发布标准对退役项目和成本的影响

获取原文
获取原文并翻译 | 示例

摘要

While the Nuclear Regulatory Commission has had specific and dose-based standards for thernrelease of liquids and gases for a long time, there are no regulatory mechanisms in place for thernrelease of solid bulk materials from a nuclear power plant. Even though free releases of smallrnquantities of solid materials continue under existing guidelines from the operating plants, thernregulatory void creates major difficulties for the bulk materials that result from therndecommissioning of a nuclear site.rnDecommissioning of a commercial nuclear power plant generates large quantities of solid bulkrnmaterials such as concrete, metal, and demolition debris. Disposition of such materials has arnlarge impact on the overall decommissioning cost. Yet, there are no clear and cost-effectivernalternatives for the disposal of these materials from a regulatory perspective.rnThis paper discusses the methodologies for clearance of solid materials1, their applicability to therndisposition of bulk materials, and the impact of lack of consistent free release standards on therndecommissioning projects and costs.
机译:尽管核监管委员会长期以来一直有针对液体和气体释放的特定且基于剂量的标准,但没有针对从核电厂释放固体散装材料的监管机制。即使根据运行中的工厂的现行指南继续继续释放少量的固体物料,但由于核电站退役而产生的散装物料,调节空洞仍造成了巨大的困难。商业核电站的退役会产生大量的固体散料,例如作为混凝土,金属和拆除碎片。此类材料的处置对总的退役成本有很大影响。但是,从监管的角度来看,尚无明确且具有成本效益的替代方法来处置这些材料。本文讨论了清除固体材料的方法1,它们对散装材料处置的适用性以及缺乏一致的自由释放标准的影响退役项目和成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号