首页> 外文会议>Vision, Sensors, and Control for Automated Manufacturing Systems >Real-time scheduling of production with dynamic setup changes
【24h】

Real-time scheduling of production with dynamic setup changes

机译:具有动态设置更改的实时生产计划

获取原文
获取原文并翻译 | 示例

摘要

Abstract: In this paper we discuss the approach to model a real-time control system for a two part type, two machine, two buffer manufacturing system with finite set-up change times for machines. The environment is stochastic due to random machine breakdown and repair times. A four level hierarchical structure is used for this purpose. The objective is to minimize the work- in-process inventory while satisfying the demand. The demand rate is considered to be piece-wise constant. Simulations are made on the system to study its performance.!9
机译:摘要:在本文中,我们讨论了一种对两零件型,两台机器,两台缓冲器制造系统的实时控制系统进行建模的方法,该系统具有对机器的有限设置更改时间。由于随机的机器故障和维修时间,环境是随机的。为此使用了四级层次结构。目的是在满足需求的同时最大程度地减少在制品库存。需求率被认为是分段恒定的。在系统上进行仿真以研究其性能!9

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号