ITERATIVE LAND MANAGEMENT PURSUANT TO WETLAND RESTORATION IN A REGIONALLY SIGNIFICANT WATERSHED IN POLK COUNTY, FLORIDA

机译:佛罗里达州波尔克县重要的流域湿地恢复所需要的迭代土地管理

获取原文
获取原文并翻译 | 示例

摘要

In 1996, the Greater Orlando Aviation Authority (GOAA) was seeking mitigation opportunities caused by the need for additional runway construction at the Orlando International Airport. Due to on-site property constraints, a decision was made to seek off-site mitigation. Two tracts of land with mitigation potential were chosen in the Reedy Creek / Lake Marion Creek watershed in Polk County, Florida. After GOAA purchased the mitigation tracts, PBS&J's staff ecologists evaluated the properties and prepared a land management plan (the Plan). The Plan focused on enhancing and restoring wetlands that had been impacted by anthropogenic disturbances, as well as preserving the remaining wetland communities. Examination of historical aerials (1941) provided a template on which restoration activities were based. For the past two years, following a construction phase and baseline monitoring, land management efforts have focused on restoration elements cited in the Plan. These included, among others, a focus on restoring hydrology to impacted areas, elimination of nuisance vegetative and faunal species, the elimination of cattle grazing and the reintroduction of a native community fire regime. Many of the intended methods described above have been impacted by the weather conditions of the past few years. Due to drought conditions, the application of prescribed fire has often been restricted, while demonstration of hydrological improvements has proven difficult to quantitatively assess. In order to meet stated permit requirements, an iterative approach was used toward the strategies supporting wetland restoration. Based on local weather and hydrologic conditions, resources and actions were re-focused to address both the client's and the regulatory agencies' most important question: how do you restore a wetland during a drought?
机译:1996年,大奥兰多航空管理局(GOAA)寻求缓解机会,原因是在奥兰多国际机场需要额外的跑道建设。由于现场财产的限制,决定寻求非现场缓解。在佛罗里达州波尔克县的芦苇溪/马里恩湖溪流域选择了两片具有缓解潜力的土地。 GOAA购买了减灾区之后,PBS&J的工作人员生态学家对这些物业进行了评估,并制定了土地管理计划(该计划)。该计划的重点是加强和恢复受人为干扰影响的湿地,并保护其余的湿地社区。对历史天线的检查(1941年)提供了恢复活动所基于的模板。在过去的两年中,在施工阶段和基准线监测之后,土地管理工作集中在计划中提到的恢复要素上。这些措施包括,除其他外,侧重于恢复受灾地区的水文状况,消除滋扰性植物和动物物种,消除牲畜放牧和重新引入当地社区火灾制度。上述许多预期方法已受到过去几年的天气状况的影响。由于干旱条件,经常限制使用明火,而水文改善的示范已证明难以定量评估。为了满足规定的许可证要求,对支持湿地恢复的策略采用了迭代方法。根据当地的天气和水文状况,将资源和行动重新定位为解决客户和监管机构最重要的问题:干旱期间如何恢复湿地?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号