EARTHQUAKE SAFETY OF AN OLD WEIR OF A LARGE RUN-OF-RIVER POWER PLANT AT THE SWISS-GERMAN BORDER

机译:瑞士-德国边境大型河道发电厂旧堰的地震安全性

获取原文
获取原文并翻译 | 示例

摘要

The dynamic analyses have shown that the old weir fulfills today's earthquake safety requirements without major strengthening of any structural components, except for the supports of the steel bridge on top of the piers. It has also to be ensured that a gantry crane located on the bridge is fastened in such a way that it cannot overturn during a strong earthquake, as the amplification of the ground acceleration on top of the bridge is very substantial. The (pseudo-static) sliding stability of the piers and the foundation slab of the sill and the stilling basin had to be improved by means of post-tensioned rock anchors and micropiles.
机译:动力分析表明,老堰满足了当今的地震安全要求,除了墩顶钢桥的支撑外,没有任何结构性部件的重大加固。还必须确保以这种方式紧固位于桥上的门式起重机,使其不会在强烈地震中倾覆,因为桥顶部的地面加速度放大非常大。桥墩,窗台和消音盆的基础平板的(伪静态)滑动稳定性必须通过后张锚固和微型桩来提高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号