ADVANCES IN SPILLWAY DESIGN USING FUSE GATES: APPLICATION TO THE MONTSALVENS DAM

机译:使用熔断器闸门进行溢洪道设计的进展:在MONTSALVENS DAM中的应用

获取原文
获取原文并翻译 | 示例

摘要

In the frame of the rehabilitation works carried out at the Montsalvens dam in Switzerland, the outflow capacity had to be increased from 150 to 346 m~3/s. This condition could be satisfied by the installation of four 5.05 m high Hydroplus fuse gates on the left bank spillway. Hydraulic model tests were performed which allowed to improve and to optimize the technical solution. The civil works were carried out from May 1997 to December 1998. A particular attention was put to the gates fabrication and to the base planarity in order to avoid any blockage during tilting.
机译:在瑞士的Montsalvens大坝进行的修复工程框架中,流出能力必须从150增加到346 m〜3 / s。可以通过在左岸溢洪道上安装四个5.05 m高的Hydroplus熔断器门来满足此条件。进行了水力模型测试,可以改进和优化技术解决方案。土建工程从1997年5月至1998年12月进行。特别注意了闸门的制造和基座的平面度,以避免倾斜时发生任何堵塞。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号