MONITORING OF LAZICI DAM

机译:拉齐奇大坝的监测

获取原文
获取原文并翻译 | 示例

摘要

Lazici rockfill dam, 130 metres high, was constructed in 1982 in a gorge which, due to topography, in general might have had an adverse effect on settlement of the clay core of an embankment dam, creating conditions for the occurrence of cracks in the core. To minimize this risk, some of the solutions that were adopted in the design are summarized as follows: (a) Core zoning, effected by placing less compressible clays in the river section, and highly plastic clays toward the abutment where, according to the results of nonlinear finite-element analyses, tensile stresses were expected. (b) Shaping the core foundation in order to provide the slope of its bottom at the abutments to be continuous. (c) Preventing adverse effects of "hanging" the core against the adjacent zones, by placing the filter materials and part of the rockfill without compaction. (d) Founding the core at the abutments in a trench extended downstream, thus preventing the effect of arching. (e) Curving the core central line, with a crest length to radius ratio 232 m/800 m. A comprehensive programme of monitoring of measuring instruments and devices was implemented.
机译:Lazici堆石坝高130米,于1982年在一个峡谷中建造,由于地形,该峡谷通常可能会对路堤坝粘土心的沉降产生不利影响,从而为岩心中出现裂缝创造了条件。 。为了最大程度地降低这种风险,设计中采用的一些解决方案总结如下:(a)岩心分区,这是通过在河段中放置可压缩性较小的粘土,并根据结果将高塑性粘土放置在桥台上来实现的非线性有限元分析的结果,预期拉伸应力。 (b)塑造核心基础,以使其基台底部的倾斜度连续。 (c)通过放置过滤材料和堆石的一部分而不压实,防止将岩心“悬挂”在相邻区域上的不利影响。 (d)在下游延伸的沟槽的基台处建立岩心,从而防止拱形效应。 (e)弯曲中心线,波峰长与半径之比为232 m / 800 m。实施了一项监测测量仪器和设备的综合计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号