The performance of recycled asphalt pavement (RAP), the effects of milling, and overlay thickness are important factors for pavement engineers to consider when making decisions on rehabilitation and maintenance activities. Specific Pavement Studies- (SPS-) 5 sections were built 10 years ago to address this issue. Performance data under well-documented SPS sections has provided valuable insight that could not have been achieved otherwise. SPS-3, SPS-5, and three hot-in-place (HIP) recycled sections were studied. One of the HEP recycled sections was adjacent to an SPS-3 and a SPS-5 section, thus they all possessed the same underlying subsurface layers. It was found that after more than 10 years of service, the RAP sections perform as well as the virgin asphalt concrete (AC) sections. This indicates that the RAP can be effective when used properly. Also, little difference was found in terms of performance on milled and non-milled sections. However, to date, there is less distress on the 125-mni sections than 50-mm sections. It is important to note that all SPS-5 sections are able to resist reflective cracking when a mixture of 30% RAP and a softer binder is used, the result is a high penetration number (30 to 45), with a flexible mixture able to resist cracking In contrast, cracks came through the HEP recycled sections in just a few weeks for US-175 and US-84. Low penetration numbers in the range of 20 to 21 were found. A 75% mixture of RAP was found to be too high, because aged binder tends to become brittle, and consequently does a poor job resisting cracking. The HEP recycled process was used satisfactorily on US-281 where no cracking potential existed. Thus, concluding that high percentage RAP mixture should not be used on any location where cracking potential is present Also, a lower viscosity AC should be added to the RAP to increase the flexibility. The results in the SPS-3 sections indicated that chip seal is the most cost-effective, preventive maintenance (PM) treatment Although rehabilitation strategy on SPS-5 sections cost more than PM treatments on SPS-3 sections, SPS-5 sections performed better than the SPS-3 sections. The most important factor influencing pavement performance on SPS-3, SPS-5, and HIP recycled sections is these types of surface AC treatments.
机译:再生沥青路面(RAP)的性能,碾磨的影响以及覆盖层的厚度是路面工程师在进行修复和维护活动决策时要考虑的重要因素。特殊路面研究-(SPS-)的5个部分是在10年前建立的,旨在解决这一问题。有据可查的SPS部分中的性能数据提供了宝贵的见解,而这些是其他时候无法实现的。研究了SPS-3,SPS-5和三个就地热(HIP)回收段。一个HEP回收段与SPS-3和SPS-5段相邻,因此它们都具有相同的下层地下层。我们发现,在使用了10年以上之后,RAP截面的性能与原始沥青混凝土(AC)截面相同。这表明正确使用RAP可以有效。另外,在铣削和非铣削截面的性能方面几乎没有发现差异。但是,迄今为止,125毫米截面的遇险情况少于50毫米截面。重要的是要注意,当使用30%RAP和较软的粘结剂的混合物时,所有SPS-5型材都能够抵抗反射裂纹,其结果是高穿透率(30至45),并且柔性混合物能够抵抗开裂相反,US-175和US-84在短短几周内就通过HEP回收段出现了开裂。发现渗透率范围在20到21之间。发现RAP的75%混合物含量过高,因为老化的粘合剂趋于变脆,因此抗裂性能差。 HEP回收工艺在US-281上令人满意地使用,那里没有裂化的可能性。因此,得出结论,不应在存在裂化可能性的任何位置使用高百分比的RAP混合物。此外,应将较低粘度的AC添加到RAP中以增加柔韧性。 SPS-3部分的结果表明,切屑密封是最具成本效益的预防性维护(PM)治疗尽管SPS-5部分的康复策略比SPS-3部分的PM治疗费用高,但SPS-5部分的效果更好而不是SPS-3部分。影响SPS-3,SPS-5和HIP再生段的路面性能的最重要因素是这些类型的表面AC处理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号