首页> 外文会议>To the eNZ of the Earth vol.1 >Seismic Stability of the Mt. Frederick Sidecast
【24h】

Seismic Stability of the Mt. Frederick Sidecast

机译:山的地震稳定性。弗雷德里克·塞德卡斯特

获取原文
获取原文并翻译 | 示例

摘要

As a part of Solid Energy's progressive rehabilitation of the Stockton Mine, it was determined that significant rehabilitation of the existing Mt Frederick Sidecast would be required to ensure the long-term stability of the sidecast. The goal of this rehabilitation is to reshape the existing stockpile into a more stable slope configuration, and the construction of a comprehensive stormwater collection and discharge system. The reconfigured slopes will facilitate the final revegetation of the exposed surfaces and the management of surface and groundwater discharges from the area. This paper briefly describes the specific details of the project and the significance of seismic conditions on the long-term stability of the reconfigured stockpile.
机译:作为Solid Energy对Stockton矿进行逐步修复的一部分,已确定需要对现存的Frederick边矿进行重大修复,以确保边矿的长期稳定性。修复的目的是将现有的仓库重塑成更稳定的边坡构造,并建设一个综合的雨水收集和排放系统。重新配置的坡度将有利于裸露表面的最终恢复植被,并管理该区域的地表水和地下水排放。本文简要介绍了该项目的具体细节以及地震条件对重新配置的储存库的长期稳定性的意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号