摘要

Ift has been 20 years since the Pingwu EHV transmission system was put into operation in 1981, the construction of the EHV transmission - translation engineering projects have made big progress in our country. By the end of 2000, the number of 500kV transformers and shunt reactors in operation in 124 substation were 713 (single phase: 602,three phase 111) with sum power 188078MVA and 230 with sum power 11230 MVA respectively, in which the number of imported transformer and reactor were 386 (single phase 326,three phase 60)with sum power 108019MVA and 88with sum power 4400MVar respectively. The number and power of imported transformers were 54.1% and 57.4% of sum total ,the number and power of imported reactors were 38.3% and 39% of the sum total, respectively. In the 106 transformers of northwest network, there were only 5 imported transformers with sum power 1375MVA from Romanian and Austrian in the way of exchange of commodities. Most of reactors were also domestic. Here We will mainly analyze the operating state of imported transformers and reactors.
机译:自1981年平武超高压输电系统投入运行至今已有20年,超高压输电-翻译工程项目的建设在我国取得了长足的进步。到2000年底,在124个变电站中运行的500kV变压器和并联电抗器分别为713个(单相:602,三相111),总功率188078MVA和230个总功率11230 MVA,其中进口数量变压器和电抗器分别为386(单相326,三相60),总功率为108019MVA,88为总功率为4400MVar。进口变压器的数量和功率分别占总数的54.1%和57.4%,进口电抗器的数量和功率分别占总数的38.3%和39%。在西北电网的106台变压器中,只有5台从罗马尼亚和奥地利进口的总功率为1375MVA的变压器以商品交换的方式提供。大多数反应堆也是家用的。这里我们将主要分析进口变压器和电抗器的运行状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号