Significant Decommissioning Success at a Sellafield Uranium Purification Plant

机译:Sellafield铀纯化厂的重大退役成功

获取原文
获取原文并翻译 | 示例

摘要

Built in the 1950 's, this plant was originally designed to purify depleted uranyl nitrate solution arising fromrnreprocessing operations at the Primary Separation Plant. The facility was used for various other purposes throughout itsrnlifecycle such as research, developmental, and trial based processes. Test rigs were operated in the building from the 1970 'srnuntil 1984 to support development of the process and equipment now used at Sellafield's Thermal Oxide Reprocessing Plantrn(Thorp).rnThe extensive decommissioning program for this facility began over twenty years ago. Many challenges have been overcomernthroughout this program such as decommissioning the four main process cells, which contained vessels and pipeline systemsrnthat were contaminated to such levels that workers had to wear pressurized suits to enter the cells. Decommissioning and sizernreduction task were carried out manually using a plasma arc cutting booth.rnIt will be the first major facility within the historic Separation Area at Sellafield to be demolished down to base slab level. The lessons learned from this project will directly benefit numerous decommissioning projects as the clean up at Sellafieldrncontinues.
机译:该工厂建于1950年代,最初旨在纯化初次分离工厂的后处理操作中产生的贫化硝酸铀酰溶液。在整个生命周期中,该设施还用于其他各种目的,例如研究,开发和基于试验的过程。从1970年的srnuntil到1984年的建筑物中一直在运行试验台,以支持现在Sellafield的热氧化物再处理厂(Thorp)中使用的工艺和设备的开发。该设施的广泛退役计划始于20多年前。在整个计划中,已经克服了许多挑战,例如使四个主要过程单元退役,这些单元中的容器和管道系统被污染到一定程度,以至于工人必须穿着加压服才能进入单元。退役和减小尺寸的任务是使用等离子弧切割室手动完成的。这将是Sellafield历史悠久的分离区内第一个主要设施,将其拆除至板坯水平。在Sellafieldrncontinues进行清理时,从该项目中学到的经验将直接使许多退役项目受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号