首页> 外文会议>The transition to closure and legacy management >Fernald Information and Records Transition to Site Steward
【24h】

Fernald Information and Records Transition to Site Steward

机译:Fernald信息和记录过渡到现场管理员

获取原文
获取原文并翻译 | 示例

摘要

The process of shutting down and transitioning a U.S. Department of Energy (DOE) site to a state of legacy management includes the decommissioning, demolition, and remediation of the facility as well as the transition of all relevant records and data (operational and environmental) to an off site repository accessible by the future site steward. Some records, primarily historical may be static. Environmental data may not be static, as in the case of groundwater quality data, and thus allowances must the made so that as new data are acquired, it is easily made available to all interested parties.rnMSE Technology Applications, Inc., is tasked with assisting Fluor Fernald, Inc. during the transition of the DOE Fernald site from an operational facility to the legacy management phase. MSE's tasks relate specifically to the identification of transition needs with respect to data systems. These include the identification of functional requirements for data access and developing a methodology to streamline the data and or information transfer to a repository.rnTo accomplish these goals, MSE has focused efforts in two areas. The first is documenting the data and software systems at Fernald in a consistent, understandable, and easily accessible format. This includes documenting the system name, system description, system owner, data flow diagrams, system documentation, manual, etc. To aid in the accessibility of the information that is being documented, MSE will make it available online through a web browser.rnThe second area MSE is focusing efforts on is developing a geographic information system (GIS) project using ESRI's ArcView? and ArcIMS? systems to provide the future site steward(s) with an interactive environmental data repository. It will have the ability to display data in an informative map view and the ability to perform statistical calculations required by the final remediation plans.rnSystem documentation efforts are moving forward (approximately 50% complete) and a prototype web page has been developed. The GIS project is available online through a web browser and is in the final operational review stages. Currently, all available soil data has been entered into the GIS database and the statistical module is operational. These efforts have resulted in the establishment of a process for smooth transition of records to the data repository. The data repository will make the records available to the future site steward.
机译:关闭美国能源部(DOE)站点并将其转换为遗留管理状态的过程包括该设施的退役,拆除和补救,以及所有相关记录和数据(运营和环境)的过渡将来的站点管理员可以访问的站点外存储库。一些记录,主要是历史记录,可能是静态的。环境数据可能不像地下水质量数据那样是静态的,因此必须留出一定的余量,以便在获取新数据时,所有相关方都可以轻松获取。MSETechnology Applications,Inc.的任务是在DOE Fernald站点从运营设施过渡到传统管理阶段的过程中,协助Fluor Fernald,Inc.。 MSE的任务专门涉及识别数据系统的过渡需求。这些包括识别数据访问的功能需求,以及开发一种方法以简化将数据和/或信息传输到存储库的过程。为了实现这些目标,MSE集中了两个方面的努力。首先是以一致,易懂且易于访问的格式记录Fernald的数据和软件系统。这包括记录系统名称,系统描述,系统所有者,数据流程图,系统文档,手册等。为帮助访问所记录的信息,MSE将通过网络浏览器在线提供该信息。 MSE正在集中精力的领域是使用ESRI的ArcView开发地理信息系统(GIS)项目吗?和ArcIMS?系统为未来的站点管理员提供交互式环境数据存储库。它将具有在信息地图视图中显示数据的能力,以及执行最终修复计划所需的统计计算的能力。系统文档的工作正在进行(大约50%完成),并且已经开发了原型网页。 GIS项目可通过Web浏览器在线获得,并且处于最后的操作审查阶段。目前,所有可用的土壤数据已输入到GIS数据库中,并且统计模块正在运行。这些努力导致建立了将记录平稳过渡到数据存储库的过程。数据存储库将使记录可供将来的站点管理员使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号