首页> 外文会议>The transition to closure and legacy management >Decommissioning of a Pilot Reprocessing Facility and Remote Decommissioning Experiences at Sellafield
【24h】

Decommissioning of a Pilot Reprocessing Facility and Remote Decommissioning Experiences at Sellafield

机译:Sellafield的试验后处理设施的退役和远程退役经验

获取原文
获取原文并翻译 | 示例

摘要

British Nuclear Group are progressing the decommissioning of the Magnox Reprocessing Pilot Plant at Sellafield. To date the project has developed and implemented innovative remote decommissioning technologies and tooling to ensure delivery of a safe and cost effective solution. The worlds first fully remotely operated Brokk was successfully deployed to enable fully remote dismantling, packaging and export of waste; including pipework, vessels and irradiated fuel. British Nuclear Group have also successfully implemented remote decommissioning systems to enable the decommissioning of significant challenges, including dismantling of Windscale Pile Chimney and Caesium Extraction Facility and wasternretrieval from PCM storage cells.
机译:英国核集团(British Nuclear Group)正在进行塞拉菲尔德(Sellafield)Magnox后处理试验工厂的退役。迄今为止,该项目已经开发并实施了创新的远程退役技术和工具,以确保交付安全且具有成本效益的解决方案。成功部署了世界上第一个完全远程操作的Brokk,以实现完全远程拆除,包装和出口废物;包括管道,船只和辐照燃料。英国核能集团还成功实施了远程退役系统,以实现重大挑战的退役,包括拆除风鳞桩烟囱和铯提取设施,以及从PCM储能单元进行废取。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号