首页> 外文会议>The IEEE International Conference on Information Management and Engineering;ICIME >Application of entropy in design risk management of the large-scale construction project
【24h】

Application of entropy in design risk management of the large-scale construction project

机译:熵在大型建设项目设计风险管理中的应用

获取原文

摘要

It is no doubt that design risk management(DRM) plays an important role in safety, quality, schedule and cost of the large-scale construction project, with complex and special surroundings and control objects, more efficient and quantitative methods are urgently required to analyze and predict the focus of DRM which need to be controlled. Simplifying and processing these complex parameters in DRM as a particular source, complying them with the basic assumptions of entropy theory, the entropy method which synthetically considering subjective and objective weight would help to identify risk factors and risk events in the practical construction project and provide a more powerful technical support for a scientific decision-making and management from the perspective of information theory.
机译:毫无疑问,设计风险管理(DRM)在大型建设项目的安全性,质量,进度和成本中起着重要作用,复杂复杂的环境和控制对象迫切需要更加有效和定量的方法来进行分析。并预测需要控制的DRM的重点。简化和处理DRM中的这些复杂参数作为特定来源,使其符合熵理论的基本假设,综合考虑主观和客观权重的熵方法将有助于在实际建设项目中识别风险因素和风险事件,并提供一个从信息论的角度为科学的决策和管理提供更强大的技术支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号