The appearance of cracks and spalling in concrete columns in a new eight-story office building brought about concerns that the injection of the ducts in the columns was poor quality. The cracks were mainly present at one floor, and trial drillings into the ducts on columns with severe cracks disclosed the presence of water and loose gravel and aggregates. Opening a duct revealed that the duct was either partially empty, filled with compacted gravel, or fully grouted. It was decided to use the impact-echo (IE) method to investigate the columns and ducts.rnEach column contains four ducts with a 25 mm (1 in.) diameter reinforcing bar for distribution of the shear stress at the lower and upper 1.0 m (3 ft) to each floor. Testing was performed for each 0.1 m (4 in.) elevation in these areas. The criterion to approve the injection was that at least 0.7 m (2 ft) of the column at the floor or the ceiling was fully injected. After testing the columns on 3 floors, it was decided to investigate the ducts in the walls of the three stairwells of the building, as they were vital for transferring the stresses of the reinforcement down through the building. Verification of the IE-system by drilling cores showed that is possible to distinguish between empty ducts, fully injected ducts, and ducts with compacted gravel. More than 35,000 measurements were made. The examination of the ducts showed that approximately 63% of tests at the top and approximately 86% at the bottom of the columns and walls indicated full injection.
机译:一座新的八层办公楼中混凝土柱的裂缝和剥落的出现引起了人们的担忧,即在柱中注入管道的质量很差。裂纹主要存在于一层,对严重裂纹柱的管道进行的试钻揭示了水,松散的砾石和骨料的存在。打开导管表明导管是部分空的,充满压实的砾石或完全灌浆的。决定使用冲击回波(IE)方法研究立柱和导管.rn每个立柱包含四个导管,直径为25 mm(1 in。)的钢筋,用于在上下1.0 m处分配剪切应力(3英尺)至每层。对这些区域中每0.1 m(4英寸)高程进行了测试。批准进样的标准是在地板或天花板上至少注入0.7 m(2 ft)的色谱柱。在3层楼的柱子上进行测试后,决定研究建筑物三个楼梯间的墙壁中的管道,因为它们对于将钢筋的应力向下传递至建筑物至关重要。通过钻芯对IE系统的验证表明,可以区分空导管,完全注入导管和带有压实砾石的导管。进行了超过35,000次测量。管道检查显示,在柱和墙的顶部大约63%的测试和底部大约86%的测试表明已完全注入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号