【24h】

TAPHOLE MANAGEMENT PRACTICES AT LAKE ERIE STEEL COMPANY

机译:伊利湖钢铁公司的塔夫勒管理实践

获取原文
获取原文并翻译 | 示例

摘要

Lake Erie Steel is located on the north shore of Lake Erie, approximately 60 km south of Hamilton, Ontario, Canada. The #1 Blast Furnace averages 5200 metric tons of iron per day with 24 tuyeres and 2 tapholes. Proper taphole practices directly affect the productivity and efficiency of the Blast Furnace, which is the reason for the dedicated efforts in improving this area of operation. This paper focuses on the taphole management practices that were investigated and integrated into the daily operation of the furnace. The topics include the modifications to the taphole drills, the auxiliary equipment of the clayguns, the taphole clays used, and the monitoring of the taphole. The operating techniques for drilling the taphole, maintaining a good iron flow, and plugging the taphole are also discussed.
机译:伊利湖钢厂位于伊利湖北岸,在加拿大安大略省汉密尔顿以南约60公里处。 #1高炉平均每天铁5200公吨,有24个风口和2个出铁口。正确的出铁口做法直接影响高炉的生产率和效率,这就是致力于改善该操作范围的原因。本文重点介绍了已研究并集成到熔炉日常运行中的出钢口管理实践。主题包括对出铁孔钻的修改,黏土枪的辅助设备,所用的出铁孔粘土以及出铁孔的监控。还讨论了用于钻出出铁孔,保持良好的铁流量以及堵塞出铁孔的操作技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号