CSN BLAST FURNACE #3 OPERATION DURING ITS SECOND CAMPAIGN OPERATIONAL IMPROVEMENTS FOR SAFE HEARTH LIFETIME

机译:CSN高炉#3在安全保障生命周期的第二次运行改进期间的运行

获取原文
获取原文并翻译 | 示例

摘要

CSN is the largest steel company in Brazil. Its production capacity is 6 Mt a year of crude steel. It is located in Volta Redonda, Rio de Janeiro State, Southeast Brazil. CSN steel plant has two blast furnaces in full operation: BF#2, with 1653 m~3 inner volume and 4237 m~3 inner volume for BF#3. Currently, BF#3 is in its third campaign and its last blow-in was August 7, 2001. Its first campaign lasted from May 1976 to August 1984 and produced 15,700,743 t in 3,390 m~3 inner volume. Its second campaign was conducted from January 1985 to April 2001, in 3,815m~3 IV. During BF#3 second campaign many improvements either on equipment, process control, burden distribution, cast house practice and raw material control were made. By that time we started natural gas injection and increased oxygen enrichment in 1986 and started coal injection in 1997. The total hot metal produced in the second campaign was 43,387,484 t. Many works have been done in this blast furnace hearth during its second campaign in order to guarantee its safe lifetime. A small repair took place around its four tap holes in 1996 and strict operational controls have been introduced from this year until the blow-out in May 2001. Details about operational control like casthouse practice improvements, process control changes, practice of loading and injection of titanium ore, small hearth repair and others improvements and changes to guarantee its safety lifetime are presented in this paper.
机译:CSN是巴西最大的钢铁公司。其年生产能力为6吨粗钢。它位于巴西东南部里约热内卢州的Volta Redonda。南航钢铁厂有两个高炉在运行:BF#2,内部容积为1653 m〜3,BF#3的内部容积为4237 m〜3。目前,BF#3正在进行第三次生产,最后一次吹入是在2001年8月7日。其第一次生产是从1976年5月到1984年8月,生产了15,700,743吨,内部容积为3,390 m〜3。其第二次运动是从1985年1月至2001年4月,进行了3​​815m〜3 IV。在BF#3的第二次运动中,在设备,过程控制,负荷分配,铸造车间实践和原材料控制方面进行了许多改进。到那时,我们于1986年开始注入天然气并增加了氧气的富集度,并于1997年开始注入煤。在第二次生产中,铁水的总产量为43,387,484吨。为了保证其安全寿命,在该高炉炉缸的第二次运动中已经进行了许多工作。 1996年对其四个出铁孔进行了小规模维修,并且从今年开始一直实行严格的操作控制,直到2001年5月井喷。有关操作控制的详细信息,例如铸造车间的操作改进,过程控制的更改,装载和注入的操作本文介绍了钛矿石,小炉膛修复以及其他改进和更改以确保其安全寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号