首页> 外文会议>Sustainable irrigation and drainage IV: Management, technologies and policies >Sustainable development of irrigation in Kukadi integrated project by transfer of surplus water from one reservoir to other
【24h】

Sustainable development of irrigation in Kukadi integrated project by transfer of surplus water from one reservoir to other

机译:通过将多余的水从一个水库转移到另一个库卡迪综合项目,实现灌溉的可持续发展

获取原文
获取原文并翻译 | 示例

摘要

An integrated Kukadi irrigation project in western ghat of Maharashtra state in India comprises of five dams built on the Kukadi River and its tributaries receiving seasonal rains. The water from four reservoirs namely Dimbhe, Manikdoh, Wadaj and Pimpalgaon Joge is fed to Yedgaon reservoir through canal and river. The command area of the Kukadi integrated system downstream of Yedgaon dam extends over three districts. The total irrigable command area under the entire Kukadi project is 156278 Ha. The irrigation requirement of the command area is increasing with completion of the canal system over a period of time. Thus storage in all five reservoirs is to be optimized to its full capacities by the end of monsoon following the approved reservoir operation schedule, to meet irrigation and drinking water requirements of the project for complete water year. In the Kukadi integrated project the works of five dams namely Yedgaon (1976), Wadaj (1975), Manikdoh (1986) Pimpalgaon Joge (1999) and Dimbhe (2001) are completed. The Reservoir has received a yield of more than 75% dependable yield only twice during the last 25 years since its completion. An integrated project comprising of five reservoirs is being severely affected due to less rains than estimated in the Manikdoh catchment area. Due to this fact the storage capacity of Manikdoh reservoir is underutilized and adversely affected the performance of the integrated Kukadi project, ultimately resulting in a great stress on the minds of management engineers to fulfill the targets with limited water resources. In contrast, the Dimbhe catchment is drawing increased yield than estimated and excess water spills over. The topographical suitability for linking two reservoirs is met with as Dimbhe reservoir is situated at higher elevation than Manikdoh reservoir.
机译:印度马哈拉施特拉邦西高止山脉的一个综合库卡迪灌溉项目包括在库卡迪河上修建的五个水坝,其支流接受季节性降雨。来自Dimbhe,Manikdoh,Wadaj和Pimpalgaon Joge四个水库的水通过运河和河流流向Yedgaon水库。 Yedgaon大坝下游的Kukadi集成系统的指挥区横跨三个地区。整个Kukadi项目下的可灌溉总指挥区为156278公顷。在一段时间内,随着运河系统的完工,命令区域的灌溉需求也在增加。因此,按照批准的水库运行时间表,应在季风结束前优化所有五个水库的储水能力,以满足整个水年项目的灌溉和饮用水需求。在库卡迪综合项目中,完成了五个水坝的工程,即耶德冈(1976),瓦达吉(1975),马尼科多(1986)皮姆普尔冈·乔格(1999)和Dimbhe(2001)。自建成以来的最近25年中,水库仅两次获得了超过75%的可靠产量。由五个水库组成的一个综合项目由于降雨少于Manikdoh集水区的估计而受到严重影响。由于这个事实,Manikdoh水库的存储容量未得到充分利用,并且对综合的Kukadi项目的性能产生了不利影响,最终给管理工程师带来了很大的压力,他们需要用有限的水资源来实现目标。相比之下,Dimbhe流域的产量却比估计的要多,过量的水溢出了。 Dimbhe水库的海拔高度高于Manikdoh水库,满足了连接两个水库的地形适宜性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号