首页> 外文会议>Structural Engineering and Public Safety >Seismic Instrumentation at theI-40 Hernando Desoto Bridge in Memphis, Tennessee
【24h】

Seismic Instrumentation at theI-40 Hernando Desoto Bridge in Memphis, Tennessee

机译:田纳西州孟菲斯的I-40 Hernando Desoto桥的地震仪器

获取原文
获取原文并翻译 | 示例

摘要

Over the past several years, The Hernando Desoto Bridge carrying I-40 across the Mississippi river at Memphis has been the scene of an intensive strong motion monitoring project, involving the installation of numerous traditional and several nontraditional forms of instrumentation designed to characterize the response of the structure to shaking from seismic and induced sources. Figure 1 illustrates the location of the I-40 bridge. This bridge is being retrofitted to withstand a magnitude (mb) 7 event at 65 km distance from the site at a depth of 20 km. The goal of the retrofit is to have this bridge fully operational following the maximum probable earthquake (2500 year return period). As part of the I-40 bridge retrofit, Friction PendulumTM Isolation Bearings have been used to insure the integrity of the main spans of the bridge.
机译:在过去的几年中,Hernando Desoto大桥在孟菲斯的密西西比河上运送I-40,这是一个密集的强运动监视项目的现场,涉及安装许多传统的和几种非传统形式的仪器,旨在表征传感器的响应。从地震和感应源到震动的结构。图1说明了I-40桥接器的位置。对该桥进行了翻新,以承受距离工地65公里,深度20公里的7级(mb)事件。改造的目标是在最大可能地震(2500年回归期)后使这座桥完全投入使用。作为I-40桥梁改造的一部分,已使用Friction PendulumTM隔离轴承来确保桥梁主要跨度的完整性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号