The design and construction of a contiguous bored pile propped retained cut on the approaches to Ashford International Station raised some challenging design issues. Design problems associated with under-drainage and groundwater control (including the performance of semi-permeable propped retaining walls) and the effects of wall installation and movement on in situ stresses were compounded by the relatively limited geotechnical engineering experience of the Atherfield and Weald Clay formations. Differences in the permeabilities of these two strata were expected, but the impact of these on the design was only fully established at the start of construction. Some aspects of the engineering behaviour of the Atherfield and Weald Clays are discussed with reference to an instrumented section of the propped retained cut. The changes in total horizontal stress and pore water pressures measured during and over a six-year period following construction of the retained cut are presented, and their significance is discussed.
机译:在通往阿什福德国际车站的道路上,连续钻孔的支撑固位截留桩的设计和施工引起了一些具有挑战性的设计问题。与欠排水和地下水控制(包括半透性支撑挡土墙的性能)相关的设计问题以及墙体安装和移动对原地应力的影响,由于阿瑟菲尔德和韦尔德黏土地层的岩土工程经验相对有限而更加复杂。预计这两个层的渗透率会有所不同,但是这些对设计的影响只有在施工开始时才完全确定。 Atherfield和Weald黏土的工程行为的某些方面将参考支撑的保留切口的仪器部分进行讨论。介绍了在保留切面施工之后的六年内以及六年内测得的总水平应力和孔隙水压力的变化,并讨论了它们的意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号