首页> 外文会议>SPE/PS-CIM/CHOA international thermal operations and heavy oil symposium and international horizontal well technology conference >An Example of a Steam Drive Pilot Project Management With 3D Seismic Survey in Northeast Brazil
【24h】

An Example of a Steam Drive Pilot Project Management With 3D Seismic Survey in Northeast Brazil

机译:巴西东北部采用3D地震勘探进行蒸汽驱动试点项目管理的示例

获取原文
获取原文并翻译 | 示例

摘要

Estreito field contains heavy oil and has been successfullyrncycled with steam since 1984. The first steam drive pilot wasrninitiated in November 1998 in the standard pattern of the field.rnA seismic survey to monitor the steam front was acquired sixrnmonths after the pilot had begun.rnThis work intends to present the integration of the pilot results,rnthe seismic survey and the numeric flow simulation as a wayrnto manage a steam drive process.rnThe paper shows also the importance of 3D seismic activitiesrnto support the steam drive management in a large scale,rncreating possibilities of improvements and optimization.
机译:Estreito油田含有重油,自1984年以来就已成功进行了蒸汽循环。1998年11月,以该油田的标准模式启动了第一个蒸汽驱动试验。rn在试验开始六个月后,进行了监测蒸汽前沿的地震勘测。旨在介绍试验结果的集成,地震勘测和数值流模拟作为管理蒸汽驱动过程的一种方式。本文还显示了3D地震活动对于大规模支持蒸汽驱动管理的重要性,从而创造了可能性。改进和优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号