首页> 外文会议>SPE Asia Pacific Oil Gas Conference and Exhibition >Initial UBD-Reservoir Candidate Screening Prevents Applying the Technology to the Wrong Reservoirs: Case Study
【24h】

Initial UBD-Reservoir Candidate Screening Prevents Applying the Technology to the Wrong Reservoirs: Case Study

机译:最初的UBD储层候选筛查无法将技术应用于错误的储层:案例研究

获取原文

摘要

In this paper, the results of the screening process for the gas reservoirs examined are presented and discussed. The study confirmed that candidate selection is a critical first step before initiating any underbalanced drilling project. It also explains why when correct candidates are chosen, UBD significantly improves productivity compared with conventional overbalanced drilling practices.
机译:本文介绍并讨论了气藏筛选过程的结果。该研究证实,在启动任何欠平衡的钻探项目之前,选择候选人是关键的第一步。这也解释了为什么选择正确的候选人时,与传统的过平衡钻井实践相比,UBD可以显着提高生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号