New Setting Technique for Gravel Pack Packers Increases Operational Safety and Reduces Costs

机译:砾石打包机的新设置技术可提高操作安全性并降低成本

获取原文

摘要

In the typical life cycle of a given well, the majority of thebudget is generally allocated to the drilling phase with theremainder to cover the completion costs. If, however, thesestages are not kept within planned budget and timeparameters, it becomes critical to reduce the time and cost inthe final completion strategies to enable the budgeting of theproject to be successful. This paper will discuss a new methodfor setting a gravel-pack packer that can assist in reducing theoverall time associated with the completion phase of a wellbore, and in turn, the subsequent cost.Packers are traditionally set by dropping a setting ball intothe workstring to create a plug in the service tool that is eitherpinned or threaded to the gravel-pack packer. The plug issubjected to an applied pressure that is translated from theservice tool to the packer, which both begins and finishes thepacker setting process. The creation of this plug, ball on seat,is affected by several factors. Such factors are wellboregeometry and deviation, the type of completion fluid, and thepacker setting depth. Each of these factors relates directly tothe time needed to create the plug, the ball landing on seat,and in certain instances, the time needed to reverse the settingball out of the work string. Again, the time to drop and/orreverse the setting ball all affect operational times.The new technology available eliminates the time and riskassociated with using setting balls against which pressure istraditionally applied to set gravel-pack packers. As the systemis hydrostatically driven, it allows a constant hydrostaticpressure to be maintained on the formation, reducing the riskof formation collapse, surges on the formation seen whenshearing the ball seat out, and the risk of the ball seat shearingprematurely. With fewer completion operations, chances formisruns are reduced, and safety and environmental risks areminimized. The reduction in setting time allows this system tobe considered a viable and affordable option for wells that meet the necessary criteria. The cost savings are even greaterin offshore environments.
机译:在给定井的典型生命周期中,大部分预算通常分配给钻井阶段,其余部分用于支付完井费用。但是,如果这些阶段没有保持在计划的预算和时间参数范围内,那么减少最终完成策略中的时间和成本以使项目的预算得以成功变得至关重要。本文将讨论一种用于设置砾石充填封隔器的新方法,该方法可帮助减少与井眼完井阶段相关的总时间,进而减少后续成本。传统上,封隔器是通过将固定球放入工作管柱中来形成的。固定在或拧紧在砾石充填包装机上的维修工具中的插头。塞子要承受施加的压力,该压力会从维修工具转移到封隔器,封隔器开始并结束封隔器的设置过程。该阀塞在阀座上的产生是受几个因素影响的。这些因素包括井眼测量和偏差,完井液的类型以及封隔器的设置深度。这些因素中的每一个都直接关系到产生塞子所需的时间,球落在座椅上的时间,并且在某些情况下还涉及将setting球从工作管柱中倒出所需的时间。同样,落下和/或倒转落球的时间都会影响操作时间。可用的新技术消除了使用落球的时间和风险,而落球是传统上施加压力来放置砾石充填封隔器的方法。由于该系统采用流体静力驱动,因此可以在地层上保持恒定的静水压力,从而降低地层塌陷的风险,剪切球座时看到的地层喘振以及球座过早剪切的风险。随着完井作业的减少,错误发生的机会减少了,安全和环境风险降到了最低。凝结时间的减少使该系统被认为是满足必要标准的井的可行且负担得起的选择。在海上环境中,成本节省甚至更大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号