Increasing Production with an Innovative Through Flow Line (TFL) Multi-Zone Completion Design for a Major Norwegian Operator

机译:挪威一家主要运营商采用创新的流水线(TFL)多区域完工设计提高产量

获取原文

摘要

Norsk Hydro operates the Snorre Field in the Norwegiansector of the North Sea with a tension leg platform (TLP) anda sub-sea production system. The initial sub-sea wells weredesigned with completions that would allow through-flow-lineservicing, and while the wells were functioning as designed,production had been declining. Therefore, Norsk Hydro feltthat the completion concepts should be evaluated for new fielddevelopments. The ensuing investigation and developmentproject led to a novel well completion concept, which is thefirst “intelligent well” subsea completion installation offshoreNorway.This innovative design changes retain the original through-flow-line (TFL) service technique system and subseainfrastructure without any modifications, maximize productionby introducing 7-in. tubing, and include hydraulically operatedinflow control devices.The supplier and operator developed the conceptduring the winter 1998/1999 and designed the resulting systemduring spring 1999.License approval for prototype development andqualification was given in the summer of 1999, and the systemcomponents were in-house tested at the supplier base in Dallasduring the fall of 1999. A thorough system qualification wasperformed at an independent Norwegian drilling and well testcenter during spring/summer of 2000. The qualificationincluded a full test-well installation and necessary interventionactivities to prove the functionality of the concept. The systemwas qualified during the summer of 2000. The first subseawell installation was done at Snorre and put on production inDecember 2000. The well completion consisted of a 4-zone/interval design for improved reservoir management.The concept principles also have application for other typewells on platforms where modifications to the wellhead andtree are not feasible.The development process and qualification of the systemhas been conducted in a very short time period from idea tooffshore implementation. This is mainly the result of a veryfocused personnel team with competent and dedicatedpersonnel between supplier, operator, and 3 rd party testingcontractor.This paper will discuss the improved system and testingthat resulted from this project. The first new productionsystem was installed in a side-tracked well, and the results ofthe completion will also be discussed.
机译:挪威水电公司通过张紧腿平台(TLP)和海底生产系统在北海的挪威地区经营Snorre油田。最初的海底油井经过设计,其完井完工后可以进行直通管线维修,而在油井按设计要求运行时,产量却在下降。因此,Norsk Hydro认为应该对完井概念进行评估以用于新的油田开发。随后的调查和开发项目导致了一个新颖的完井概念,这是挪威海上第一个“智能井”海底完井安装。这种创新的设计变更保留了原有的直通管线(TFL)服务技术系统和海底基础设施,无需进行任何修改,就可以最大限度地提高通过引入7英寸进行生产。供应商和操作员在1998/1999年冬季开发了该概念,并在1999年春季设计了系统,并在1999年夏季获得了原型开发和认证的许可,并且系统组件在内部使用。在1999年秋季在达拉斯的供应商基地进行了测试。2000年春夏期间,在独立的挪威钻井和油井测试中心进行了全面的系统鉴定。该鉴定包括完整的油井安装和必要的干预活动,以证明该概念的功能。 。该系统于2000年夏季通过鉴定。第一座海底井安装在Snorre进行,并于2000年12月投入生产。该井的完井包括4分区/间隔设计,以改善储层管理。概念原理也适用于其他类型的井该系统的开发过程和鉴定工作是在从构思到海上实施的很短时间内进行的。这主要是由一支非常集中的人员团队,在供应商,操作员和第三方测试承包商之间具有称职和敬业的人员组成的结果。本文将讨论此项目带来的改进的系统和测试。第一个新的生产系统安装在侧井中,还将讨论完井结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号