首页> 外文会议>Soil mechanics and geotechnical engineering: Challenges and solutions >Seepage and Deformations of Dams and their Monitoring
【24h】

Seepage and Deformations of Dams and their Monitoring

机译:大坝的渗流,变形及其监测

获取原文
获取外文期刊封面目录资料

摘要

This paper presents results of deformation and seepage analyses of a number of large earthdams and a high concrete arch dam. The dams are all in Iran and under operation. The paper focuses on thebehaviors of the dams based on their monitoring results. The monitoring results are employed to interpret thehydro-geotechnical behavior of the dams, mostly during their construction and first impounding. Numericalmodeling and analyses have been carried out for all of the dams. Selective results of the numerical analysesare compiled and compared occasionally with the due data acquired from monitoring of the dams. Deformationsof the dams, arching ratio, and pore water pressure ratio in core of the earth dams are thoroughly studied.Also the paper briefly suggests major challenges involved in dam engineering and related researches. Thechallenges are categorized as: material-related challenges, instrumentation and monitoring-related challengesand numerical modeling and analysis- related challenges.
机译:本文介绍了许多大型土体的变形和渗流分析结果 水坝和高混凝土拱坝。这些大坝都在伊朗并在运营中。本文着重于 大坝的行为基于其监测结果。监测结果用于解释 大坝的水力岩土行为,主要是在水坝的建造和首次蓄水期间。数值型 已经对所有大坝进行了建模和分析。数值分析的选择结果 汇总并偶尔将其与从大坝监控中获取的适当数据进行比较。变形 深入研究了坝体的拱,拱形比和孔隙水压力比。 本文还简要地提出了大坝工程和相关研究中的主要挑战。这 挑战归类为:与材料相关的挑战,与仪器和监控相关的挑战 以及与数值建模和分析相关的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号