ARE ESTIMATORS GETTING IT RIGHT? COMPARING ACTUAL AND ESTIMATED COSTS

机译:估计正确吗?比较实际成本和估计成本

获取原文

摘要

1. Even significant variations in individual equipment, supply, wage, and salary cost values from the actual do not render the overall estimate invalid, if the majority of the remaining cost data are sound. 2. Errors in the design represent a greater potential for an invalid estimate than do errors in the cost data. 3. Each of the potential sources for cost information presents data adequate for pre-feasibility level cost estimates, even though equipment and supply specifications may alter the actual prices paid during development and production.
机译:1.如果大多数剩余成本数据是合理的,则即使单个设备,供应,工资和薪水成本值与实际值之间存在显着差异,也不会使总体估计无效。 2.与成本数据中的错误相比,设计中的错误表示无效估计的可能性更大。 3.即使设备和供应规格可能会改变开发和生产过程中支付的实际价格,每种潜在的成本信息来源都将提供足够的数据来进行可行性前的成本估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号